一、传统作业模式优劣分析随着社会发展水平的提高,对电力线路的建设提出了更高的要求,因此目前输电线路工程勘测设计也被要求进行更高水平的优化设计,其中线路路径的优化设计是重要的组成部分,为此需要测量、设计等相关各专业提高技术水平,实现真正意义上的优化设计。传统线路设计是由设计人员在1:5万或者1:1万地形图上画出初步路径走向,然后在现场踏勘确认大方案走向,随后在搜集各种协议文件,提交审查,根据审查路径进行测量,测量、设计人员在现场进行终勘定位测量,通常都是依靠经纬仪、全站仪等仪器选择线路路径称为“选线”;随后
First, the analysis of the advantages and disadvantages of the traditional mode of operation With the improvement of social development, the construction of power lines put forward higher requirements, so the current transmission line engineering survey design is also required to carry out a higher level of optimization design, of which route Optimization is an important part of the design, which requires measurement, design and other related professional to improve the technical level, to achieve the true sense of the optimal design. The traditional circuit design is designed by the designer in the 1: 50000 or 1: 10000 topographic map to draw the initial path, and then reconnoitred in the scene to identify large program to move, then collect all kinds of protocol documents, submitted for review, according to the review path Measurement, measurement, designers in the field of final positioning survey, usually rely on theodolite, total station and other equipment to select the line path called “line selection”; then