给水系统是城市化建设中的重点形式,更是在施工过程中出现施工制约和影响因素的主要方式。在当前施工的过程中,管道采用明挖排管法施工方法已成为主要的给水系统的施工措施。管道应在管底标高和管基质量检查合格后,其在施工中所选用的各种材料和配件应当及时的进行检查和分析,确保在施工中能够满足当前施工措施和施工质量要求。管材接口,均应符合规范及设计要求,并且要进行抽样检查和接口的牢固处理模式和处理方式,并且针对其中存在的响应方式和处理模式。本文就钢管铺设工艺和技术方式进行综合管理,保证施工质量能够满足当前社会发展的需求。
Water supply system is the key form of urbanization, but also the main mode of construction constraints and influencing factors in the construction process. In the current construction process, the method of using open-cut drainage pipe method has become the main construction of the water supply system. The pipe should be in the pipe bottom elevation and pipe quality inspection after passing through the construction of the selected materials and accessories should be timely inspection and analysis to ensure that the construction can meet the current construction measures and construction quality requirements. Pipe interface, should be in line with norms and design requirements, and to conduct a sampling inspection and interface of the solid processing mode and processing methods, and for the existence of the response mode and processing mode. In this paper, the integrated management of steel pipe laying technology and technical methods to ensure the quality of construction to meet the current needs of social development.