苏州街站是采用浅埋暗挖法施工的地铁车站,在施工过程中遇到了大量的上层滞水,它给车站的开挖安全构成了极大的风险。文章总结了车站施工中处理上层滞水的各种技术措施,为今后类似的工程施工积累了经验。
Suzhou Street Station is a metro station constructed by shallow burying and undercutting. During the construction process, a large amount of upper water stagnation is encountered, which poses a great risk to the excavation safety of the station. The article summarizes various technical measures to deal with upper stagnant water in station construction and accumulates experience for similar construction in the future.