论文部分内容阅读
西北水利科学研究所提出的“死库复活技术的研究”成果,于1992年1月13日至14日,由水利部水管司主持,邀请水利部科教司、国家防汛办、水电规划设计总院、清华大学、水科院、黄委会水科院等单位的十多位专家、教授进行了技术鉴定。水库泥沙淤积,已成为我国水库安全运用和水资源开发中的一个突出问题。水库一旦被泥沙淤满,一般是予以废弃而重建新库。1986年由水利部水管司委托西北水科所承担了这
Northwest Institute of Hydraulic Research “deadlock revival technology research” results, from January 13, 1992 to January 14, chaired by the Water Resources Department, Ministry of Water Resources, Science and Education Division, the State Flood Control Office, Hydropower Planning and Design Institute , Tsinghua University, Hydrology Institute, the Yellow River Hydrology Institute and other units of more than a dozen experts and professors conducted a technical appraisal. Reservoir sedimentation has become a prominent issue in the safe use of reservoirs and water resources development in China. Once the reservoir is full of silt, it is generally abandoned and rebuilt. In 1986, it was entrusted by the Northwest Water Division of the Water Management Department of the Ministry of Water Resources