竖井提升广泛地应用于黄金矿山的生产。对于多中段竖井提升,如何提高其生产能力,如何组织、管理竖井生产,现将我们的生产实践和经验介绍给读者以供参考。 一、竖井概况简介 我矿九曲分矿255竖井是一盲竖井,采用2号单层双罐提升,钢丝绳罐道,竖井断面为4528mm×2300mm,该井由原竖井延深改造而成,现已延深到+50米中段,井深210米。
Shaft lift is widely used in the production of gold mines. How to improve its production capacity and how to organize and manage the shaft production for multi-medium shaft hoisting, we will introduce our production practices and experience to the readers for reference. First, the shaft profile Brief introduction My mine nine sub-sub-255 shaft is a blind shaft, the use of two single-layer two-tank hoist, wire rope channel, shaft section 4528mm × 2300mm, the shaft from the original shaft extension transformation made, now Has been extended to +50 meters in the middle, well 210 meters deep.