论文部分内容阅读
通过对高速电气化铁道接触网锚段关节施工关键技术的讨论,将设计院安装图与现场实际相结合,并针对实际施工中的规律分别对中心柱和转换柱的装配形式提出了相应的建议。
Through the discussion of the key technologies of the joint construction of the catenary in the high-speed electrified railroad, the installation drawings of the design institute are combined with the actual conditions of the railway. Corresponding suggestions are put forward for the assembly forms of the central column and the conversion column according to the laws of the actual construction.