论文部分内容阅读
这是笔者经办的一起建筑工程结算纠纷案:某房地产开发商与某建筑商签订的《建筑安装工程承包合同》约定:承包范围包括上建、夯扩桩、铝合金和水电安装及宝内外装修:承包方式为包工、包料、包总造价;在工程造价中,材料价可调补.其调整的原则为xx市信息价;结算以省1992年预算定额及有关规定,按集体三类取费标准、xx市工程造价管理站公布的当年同期材料价格信息为依据计价,工程总造价为人民币 597.14万元。工程竣工交付后,双方对工程造
This is the author handled a dispute settlement of construction projects: a real estate developer and a builder signed the “construction and installation contract contract”: the scope of contracting, including construction, rammed expansion of piles, aluminum and hydropower installation and inside and outside the Po Decoration: contracting for the contractor, package materials, the total package cost; in the project cost, the material price can be adjusted up. The principle of adjustment is the information price of xx city; the settlement is based on the province’s budget quotas in 1992 and related regulations, and is calculated on the basis of the collective three types of fee collection standards and the materials price information published in the same period of the same year by xx City Project Cost Management Station. RMB 5.9714 million yuan. After the completion of the project delivery, both sides made the project