Annual Report on SPR Operation in 2002

来源 :Annual Report for China Institute of Atomic Energy | 被引量 : 0次 | 上传用户:zhenggangdiy
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
1 Information of operation SPR is operated for 2 727.983 h in 2002, the reactor’s rated power is 3.5 MW,and the total releasedenergy is 397.831 MW d Times of reactor’s operation and non-plan shut-down are 20 and 37,respectively. The pH and resistivity of primary loop water is 5.8 and 66.7×10~4Ω·cm, respectively; 1 Information of operation SPR is operated for 2 727.983 h in 2002, the reactor’s rated power is 3.5 MW, and the total release energy is 397.831 MW d Times of reactor’s operation and non-plan shut-down are 20 and 37, respectively. The pH and resistivity of primary loop water is 5.8 and 66.7 × 10 ~ 4Ω · cm, respectively;
其他文献
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
【因特网2002年2月报道】 法国核监督和鉴定机构改组 法国部长会议通过了由环境部长提交的两个法令,根据这两个法令组成两个机构,一个是辐射和防护安全研究院(IRSN),它是由核
随着升学压力的与日俱增,小学生的课业负担也日益加重,美术课作为小学义务教学中的一门学科,却无法受到应有的重视。小学美术和小学音乐、小学舞蹈都是艺术课程的重要组成部
目的探讨中晚期宫颈癌术前动脉灌注化疗栓塞的临床价值。方法选择2005年6月2009年12月35例经阴道镜活检确诊为宫颈癌临床分期Ⅱa~Ⅲb期宫颈癌患者,术前行1次子宫动脉化疗栓塞,
由北京大学、清华大学、四川大学和兰州大学共同创办和建设的“核科学和技术教育部网上合作研究中心”(网址 :http ://nst.pku .edu .cn/)是目前国内核科学和技术领域最活跃、信息量最丰富的
进入二十一世纪以来,中国铸造业的产出量连续稳坐世界铸造第一把交椅,2011年业已超过4千万吨,占全球铸件产量的40%以上,成了名副其实的世界铸造大国。如今,中国铸造业正瞄准
鸡西矿业集团公司张辰煤矿西三采区3
期刊
根据HL-2A装置总体规划及工程进展,从德国拆运回来的ASDEX真空室必须在特制的平台上进行预装。原ASDEX装置真空室经10年的实验运行,现在能否满足HL-2A主机的需要,我们的技术
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
将多根连接钻杆近似为无约束的一维杆状体,阐述了轴向激发的弹性波在钻杆中一维纵波的传播规律:弹性波传播到钻杆顶端将产生能量较强的反射波;钻杆中弹性波各振型频率的差为