鉴定会于10月25日~29日在沈阳召开。会议由煤炭部设计管理局主持,参加会议的有机械、冶金,煤炭系统的厂矿、院所共15个单位,95名代表。会议听取了沈阳煤矿设计研究院的设计研究总结,哈尔滨向东机电厂的试制总结,红阳二矿和晓南矿的工业运行报告,审查了鉴定技术资料,并赴红阳二矿副井和晓南矿主井实地考核了装置的运行性能
Identification will be held October 25 to 29 in Shenyang. The meeting was chaired by the Design Bureau of the Ministry of Coal Industry. At the meeting, there were 15 units and 95 representatives from factories, mines, and institutes with machinery, metallurgy and coal systems. The meeting listened to the design and research summary of Shenyang Coal Mine Design and Research Institute, the trial production of Harbin Xiangdong Power Plant, the report on the industrial operation of Hongyang No.2 Mine and Xiaonan Mine, reviewed the identification technical data and went to the auxiliary wells of Hongyang No.2 Mine and Xiaonan main mine site assessment of the operational performance of the device