1985年4月2日,中国建筑三局二公司第一工程处第三施工队,在中南民族学院化学楼工程施工磨石地面。东阳农建队配合施工。队领导为了省工,每台磨石机只派一人操作,把清理电线的一人取消。当一台磨石机磨到墙角转弯时,因无人清理电线,操纵磨石机的工人又不停机清理,因此,磨石机底盘将电线绞断,安装的触电保安器立即自动断电,在场其它几台磨石机
On April 2, 1985, the third construction team of the China Construction Third Bureau Second Corporation’s first engineering office, and the construction of the ground floor of the chemical floor project of the Central South University for Nationalities. Dongyang Agricultural Construction Team cooperated with construction. In order to save labor, the leader of the team dispatched only one person for each stone mill and cancelled one of the wires. When a grinding stone grinder was turned to a corner, because no one cleaned the wire, the workers who operated the grinding stone did not stop cleaning. Therefore, the chassis of the stone grinder twisted the wire and the installed electric shock protector was automatically turned off. Several other stone mills on site