在批林批孔运动的推动下,今年五月间,我公司广大革命职工发扬了敢想、敢干的革命精神,在金山店矿主厂房扩建工程中成功地试用液压滑模施工了一组22.7米高的钢筋混凝土双肢柱,取得了初步成果,质量符合要求。一、工程概况该厂房跨度为30米,设有30吨桥式吊车两台,双肢柱柱距6米,柱全高22.7米,吊车梁支座以下断面为1600毫米×700毫米,
In May this year, the majority of the revolutionary workers of our company carried forward the revolutionary spirit of daring to think and dare to do a good job. In the expansion project of the Jinshandian mine owner’s plant, a group of hydraulic slipforms was successfully constructed. The 22.7-meter-high reinforced concrete double-limb columns achieved preliminary results and the quality was in line with the requirements. I. Overview of the project The factory span is 30 meters. There are two 30-ton bridge cranes. The distance between the two limbs is 6 meters. The total height of the column is 22.7 meters. The section below the crane beam bearing is 1600 mm by 700 mm.