论文部分内容阅读
钢筋混凝土桥梁施工涉及到的影响内容比较多,基于干预因素的特殊性和复杂性,在后续控制和应用过程中,必须及时对影响因素进行分析,使其符合现有施工体系的本质性要求。近些年来我国交通运输业取得了突出的进步,尤其是铁路工程,由于钢筋混凝土桥梁施工形式比较复杂,在施工过程中必须要从施工现状入手,制定有效的管理措施,最终达到提升施工质量的目的。在本次为例中将以达州市天然气化工产业区铁路专用线的钢筋混凝土施工特点和现状为研究点,结合实际情况对具体的施工质量控制措施进行分析。
Due to the particularity and complexity of the intervention factors, the influence factors should be analyzed in time in follow-up control and application process so that it conforms to the essential requirements of the existing construction system. In recent years, China’s transportation industry has made outstanding progress, especially in railway engineering. Due to the complexity of the construction forms of reinforced concrete bridges, it is necessary to start with the status quo of construction in the course of construction so as to formulate effective management measures and ultimately to enhance the quality of construction purpose. In this case, the construction characteristics and current status of the reinforced concrete construction of Dazhou Natural Gas Chemical Industrial Zone will be taken as a research point, and the concrete construction quality control measures will be analyzed according to the actual situation.