Optimal production lot size with process deterioration under an extended inspection policy

来源 :Journal of Systems Engineering and Electronics | 被引量 : 0次 | 上传用户:Cgsking
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
A mathematical model to determine the optimal production lot size for a deteriorating production system under an extended product inspection policy is developed.The last-K product inspection policy is considered so that the nonconforming items can be reduced,under which the last K products in a production lot are inspected and the nonconforming items from those inspected are reworked.Consider that the products produced towards the end of a production lot are more likely to be nonconforming,is proposed an extended product inspection policy for a deteriorating production system.That is,in a production lot,product inspections are performed among the middle K_1 items and after inspections,all of the last K_2 products are directly reworked without inspections.Our objective here is the joint optimization of the production lot size and the corresponding extended inspection policy such that the expected total cost per unit time is minimized.Since there is no closed form expression for our optimal policy,the existence for the optimal production inspection policy and an upper bound for the optimal lot size are obtained.Furthermore,an efficient solution procedure is provided to search for the optimal policy.Finally, numerical examples are given to illustrate the proposed model and indicate that the expected total cost per unit time of our product inspection model is less than that of the last-K inspection policy. A mathematical model to determine the optimal production lot size for a deteriorating production system under an extended product inspection policy is developed. The last-K product inspection policy is considered so that the nonconforming items can be reduced, under which the last K products in a production lot are inspected and the nonconforming items from those inspected are reworked. CPCider that the products produced towards the end of a production lot are more likely to be nonconforming, is proposed an extended product inspection policy for a deteriorating production system. What is is, in a production lot, product inspections are performed among the middle K_1 items and after inspections, all of the last k_2 products are directly reworked without inspections.Our objective here is the joint optimization of the production lot size and the corresponding extended inspection policy such that the expected total cost per unit time is minimized.Since there is no closed form expression for our opti mal policy, the existence for the optimal production inspection policy and an upper bound for the optimal lot size are obtained. Further, an efficient solution procedure is provided to search for the optimal policy. Finally, numerical examples are given to illustrate the proposed model and indicate that the expected total cost per unit time of our product inspection model is less than that of the last-K inspection policy.
其他文献
普通内墙涂料如聚乙烯醇涂料、107胶徐料等因原材料价格大幅上涨,成本大幅度提高,以致在广大农村地区出现了以下两种令人担忧的情况:(1)有些厂家为了保证产品质量,不得不提高产品售
满脑子“有理走遍天下”的中国古训,可只是从湖南走到广东,别说天下,连中国都没走出去,怎么便不一样了呢? 刚刚走下长途汽车,工厂管理员便大声喝骂我们,赶着我们去交押金,让
英语里的“to”是介词,表示方向、时间,“朝...方向;向;往;到”等。它是一个千变万化的单词,与不同的单词搭配表示不同的意思。意思往往要根据与其所搭配的单词来确定。你知
21世纪,随着科学技术的不断进步和知识经济时代的到来,技术创新已成为振兴经济,提升区域竞争力的重要手段。为增强青岛市技术创新的能力,提升城市竞争力,本文基于青岛市技术
在工程中,用机械式激振器偏心施加简谐扰力的办法,使基础产生扭转振动.本文介绍了试验情况以及取得的数据,并且提出了建议. In the project, the mechanical exciter eccent
人物张罗,男性,说不清的岁数和职业。时间现在。地点张罗的家。[幕启。台上一桌一椅一部电话。[张罗急匆匆地上,急忙脱衣、急忙放兜、急忙看表、急忙操起电话,急忙捺键。张
写下这两句话,绝不是耸人听闻,而是鲁花品牌成长的真实写照,也是鲁花从一个地方品牌成为全国著名品牌的必经之路。为什么要在山东卫视做广告似乎是一个老生常谈。一个想在近
“烦死了,烦死了!”我大叫。“烦什么?我还不是关心你!”老妈瞪大了眼睛。这时候的老妈最讨厌,你瞧,她一个劲儿地追问我期中考试的事儿。“不知道,不知道!”我撅起了嘴。“考
有人写了一篇文章《市而优则学》,觉得耳目一新,无疑,这是一篇上乘之作。作者说,“市”者为商。“市”而优者即下海经商发了财的大款也。他们有了钱,有了时间不是去学习,而
生成性教学是在有意义的教学情境中,师生通过自主探究、合作交流,共同建构知识体系和升华教学主题的教学活动。而生存必然导致大量错误的产生,“错误”它具有刺 Generative