论文部分内容阅读
介绍了电力市场下考虑安全约束的发电计划生成方法及其处理过程 ,其核心技术问题是机组组合优化 ,需考虑负荷平衡、机组出力范围、旋转备用、爬坡速度、机组最小启停时间等约束以及网络传输能力的限制。该发电计划生成策略已在辽宁电力市场中成功应用
This paper introduces the generation method and process of power generation planning considering the safety constraints in the power market. The core technical problem is the optimization of unit combination, which needs to consider load balance, unit output range, rotation reserve, climbing speed, and minimum unit start-up and shutdown time constraints. And the limitations of network transmission capabilities. The power generation plan generation strategy has been successfully applied in the Liaoning power market