论文部分内容阅读
1简要说明强流回旋加速器综合实验装置是原子能院串列加速器升级工程的重要设计验证项目,设计能量为10MeV,它包括了1台小型回旋加速器的全套设备,具备其全部功能。它作为1个综合试验平台,对100MeV强流回旋加速器的理论设计进行工程可行性验证,同时用于强流回旋加速器的新型工艺研究和设备检测。2006年综合实验装置的主体设备在原201室厂房组装,完成主磁场测量与垫补。
1 Brief Description The High Integer cyclotron integrated experimental setup is an important design verification project for the IAEA Tandem Accelerator upgrade project. With a designed energy of 10 MeV, it includes a complete set of equipment for a small cyclotron with all its features. It is used as an integrated test platform to verify the feasibility of the theoretical design of a 100 MeV high-pressure cyclotron and to use for the new process research and equipment testing of a high-intensity cyclotron. In 2006, the main equipment of the integrated experiment device was assembled in the original 201 room plant to complete the main magnetic field measurement and padding.