摘要:随着经济的快速增长,人们生活水平的不断提高,居民对生活环境的绿化水平有了更高的要求。为了满足居民的需求,园林建筑施工过程中对绿化施工技术也有了更高的要求。文章中笔者结合多年的工作经验对园林施工的特点,园林绿化施工技术,两季栽培以及园林施工进度控制措施进行了简要的介绍。
关键词:园林绿化施工技术;施工管理;两季栽培;进度控制。
Abstract:: with the rapid growth of economy, people life level unceasing enhancement, the living environment of the residents of greening level have higher requirements. In order to meet the needs of residents, the construction method of the greening landscape in the course of construction, also have higher requirements. Article, the author combined with years of experience on the characteristics of garden construction, landscape construction technology, two season cultivation and garden construction progress control measures are briefly introduced.
Keywords: the botanical garden afforestation construction technology; Construction management; Two season cultivation; Schedule control.
中图分类号:TU74文献标识码:A文章编号:
引言:随着人们生活水平的不断提高,居民对城市园林建设的绿化程度有了更高的要求。随着园林的绿化建设水平的不断提高,城市的绿化程度、生态环境以及人们的生活质量都有了明显的提高。与此同时,许多新兴的建筑材料、施工工艺的问世,使得园林绿化建设结构复杂化。园林建筑的种类越来越多、专业分工也随之越来越细,这就导致了园林建设过程中一些问题的出现。
一、目前园林施工的特点分析。
知己知彼,方能百战不殆。为了保证园林施工过程的顺利进行,有效保证工程质量以及工程进度,首先应该了解园林施工的特点。为了更好地理解园林建筑施工管理各方面的内容笔者首先对园林工程的施工特点进行简要的介绍。无论是园林建设项目的施工还是某个单位工程的施工都属于园林工程施工项目的范畴。举例进行解释,无论是一个公园的建设,还是公园中的绿化种植工程都属于园林建筑施工。下面笔者从五个方面对园林建筑的施工特点进行介绍:
第一园林建筑施工项目属于建设项目,它的任务即包括单项工程也包括单位工程;第二,园林建筑工程的施工主体是施工单位;第三,工程合同所确定的内容是园林建筑施工的任务;第四,园林建筑施工具有生产周期长、施工周期短的特点,并且具有建筑面积大、结构复杂多样、涵盖面广以及固定性等特点;第五,园林建筑工程不同于一般的民间工程、市政工程,它的施工对象是具有生命的实体,为了保证植物的茁壮成长,保证其成活率,必须对其进行精心的呵护。
二、园林绿化施工工艺分析。
在进行园林绿化工程施工过程中应该加大对植物种植的重视。在植物种植过程中,不同于对其他建筑材料的选择,绿色植物的选择有自己独特的特点。要严格按照设计要求进行绿色植物的选择,所选植物的品种不仅应该符合设计图纸的要求,还应该符合其他方面对植物的要求。在实际施工过程中,施工单位应该严格按照图纸进行植物的施工,这样才能体现设计者的设计理念,达到预期的效果。在对植物的品种、大小按照图纸选择好以后,还有选择生长旺盛、没有病害的植物进行种植。购买以后,在运输过程中为了提高植物的存活率,应该注意对植物根茎、枝叶等的保护。
2.1、园林绿色施工过程中植物栽培技术分析。
将植物的栽培时要选择合理的时间,要在专业人员的指导下进行种植,合理地安排种植顺序,将地下、地上;道路、铺装与苗木的栽植顺序制定出种植进度计划表。为了加快施工进度,可以选择两季栽植的施工方法,秋冬季和春季栽植,根据苗木发芽的早晚和苗源的远近合理安排;对大规格苗木及重点地段苗木的精心养护;适时栽植不仅可以提高植物的成活率,加快施工进度还可以缩减对植物的养护费用,缩减施工成本,提高经济效益。这样就可以保证以最低的成本投入来获得较高的工程质量。
2.2、园林绿色施工过程中应两季栽植,适时栽培。
在进行植物栽培过程中应该根据树木栽植成活的原理,植树应选择在蒸腾作用欠旺盛蒸腾量少、有利于根系恢复生长和吸收、易于维持水平代谢平衡的时期。就大多数地区而言,春季和秋季都是适宜移栽的季节。
经过预掘的苗木,或假植苗、容器苗等,一年四季均可栽植,不仅成活率高,且可最大限度的保留枝和叶,观赏效果颇佳。秋冬季和春季栽植,根据苗木发芽的早晚和苗源的远近合理安排;对大规格苗木及重点地段苗木的精心养护;适时栽植与养护费用的关系及对成活率的影响。
根据植物的生长特点,成活原理选择春季、雨季栽植。连续多日的雨天后,土壤含水量过多通气不良,栽植作业使土壤泥泞,不利于新根恢复生长,并易引起根系腐烂,尤其是土质粘重的地方,应待雨停后2~3天再栽植。秋季栽植,通常在越冬前根系有一个小的生长高峰,这些条件都有利于栽植初期的水分平衡和根系恢复。
三、加强园林施工的进度控制。
3.1、通过拟定施工计划来控制进度。
由于园林工程在施工过程中很容易出现多单位交叉作业的现象,园林工程的施工场地也会被大量的占用。交叉作业以及场地被占用都会导致园林工程的施工进度在一定程度上被限制。在实际施工过程中,水景、土建、道路面层、照明、绿化等其中的每一个工程延期完成都会造成整个园林工程的施工进度延期。为了保证施工进度的顺利进行,各个施工单位之间应该加强沟通,制定合理的进度计划、合理安排各施工过程的关系才能有效的控制进度计划。
做好应对措施来保证工程进度。
在实际施工过程中,施工进度还会受天气的影响。在进行苗木种植以及土方整理时一旦遇到雨天就会受到严重的影响。为了避免天气情况对施工进度的影响在制定施工进度计划的过程中应该成分考虑到施工期间的天气变化对施工进度的影响,并据此制定出合理的防范措施和应急计划。通过制定防范措施来预防天气变化等特殊情况对施工进度的影响。
通过提高管理人员的水平来保证工程进度。
项目部管理人员的管理水平能否达到要求,是否能够制定出合理的施工组织计划以及合理的平面布置图,能否合理的配置劳动力以及施工机械等等,都对园林工程的施工进度有著极其重要的影响。为了保证施工进度的顺利展开,应该不断提高管理人员的综合素质、技术水平,管理人员还应该在工作中不断地积累经验,并加强学习。
工程进度控制的主要措施
3.4、利用现代管理手段进行进度控制。
为了有效保证园林工程施工进度的顺利展开,可以从组织措施、合同措施、技术措施以及经济和信息管理措施几个方面进行控制。
3.4.1、组织措施。上文中已经提到园林工程建筑的规模较大、所涉及的工种较多,在整个建筑工程中,可能需要多个不同性质的施工单位共同来施工。除此之外,应该掌握好各施工阶段的关联性,做好各阶段的有机结合,这有这样才能保证整个施工进度计划的合理性,保证园林绿化工程能按照预计的工期完工。为了保证应该做好组织措施,合理安排各施工单位的施工计划,合理组织安排。
3.4.2.、合同措施。为了使得进度计划得到有效的控制,应该加强对合同的管理,保证合同总工期与进度合同之间的一致性。
3.4.3、技术措施。为了保证进度计划在进行调整之后依然按时竣工,应该加强施工进度计划的技术措施。将进度计划要与园林建设施工现场的地理情况、天气情况、施工人员等各种因素有机的结合起来。按照这些因素制定出合理的园林绿化进度计划,合理安排地下、地上;道路、铺装与苗木的栽植。并将整个规划划分成若干部分,并根据每个部分绿化植物的生长特点、栽培情况制定出适合本阶段的进度计划。
3.4.4、经济和信息管理措施。在园林工程的整个施工过程中应该加强对全过程的监测、调整、分析和反馈并且要建立进度控制过程中的信息流动,并且要做好信息管理工作。
结束语:文章中笔者结合多年的工作经验对园林施工过程中的施工特点、园林绿化施工的技术分析以及施工进度的保证措施进行了简要的介绍。加强园林绿化工程建设符合人们对居住环境的绿化需求,符合当代环境保护以及生态化发展的需求。
参考文献:
【1】张和山;浅谈影响园林绿化施工质量的因素及解决对策[J];科学之友;2010年10期
【2】刘先锋;园林绿化工程施工管理探讨[J];广东科技;2007年03期
【3】胡旭明;太原市园林绿化工程监理及对策[J];山西科技;2010年03期
关键词:园林绿化施工技术;施工管理;两季栽培;进度控制。
Abstract:: with the rapid growth of economy, people life level unceasing enhancement, the living environment of the residents of greening level have higher requirements. In order to meet the needs of residents, the construction method of the greening landscape in the course of construction, also have higher requirements. Article, the author combined with years of experience on the characteristics of garden construction, landscape construction technology, two season cultivation and garden construction progress control measures are briefly introduced.
Keywords: the botanical garden afforestation construction technology; Construction management; Two season cultivation; Schedule control.
中图分类号:TU74文献标识码:A文章编号:
引言:随着人们生活水平的不断提高,居民对城市园林建设的绿化程度有了更高的要求。随着园林的绿化建设水平的不断提高,城市的绿化程度、生态环境以及人们的生活质量都有了明显的提高。与此同时,许多新兴的建筑材料、施工工艺的问世,使得园林绿化建设结构复杂化。园林建筑的种类越来越多、专业分工也随之越来越细,这就导致了园林建设过程中一些问题的出现。
一、目前园林施工的特点分析。
知己知彼,方能百战不殆。为了保证园林施工过程的顺利进行,有效保证工程质量以及工程进度,首先应该了解园林施工的特点。为了更好地理解园林建筑施工管理各方面的内容笔者首先对园林工程的施工特点进行简要的介绍。无论是园林建设项目的施工还是某个单位工程的施工都属于园林工程施工项目的范畴。举例进行解释,无论是一个公园的建设,还是公园中的绿化种植工程都属于园林建筑施工。下面笔者从五个方面对园林建筑的施工特点进行介绍:
第一园林建筑施工项目属于建设项目,它的任务即包括单项工程也包括单位工程;第二,园林建筑工程的施工主体是施工单位;第三,工程合同所确定的内容是园林建筑施工的任务;第四,园林建筑施工具有生产周期长、施工周期短的特点,并且具有建筑面积大、结构复杂多样、涵盖面广以及固定性等特点;第五,园林建筑工程不同于一般的民间工程、市政工程,它的施工对象是具有生命的实体,为了保证植物的茁壮成长,保证其成活率,必须对其进行精心的呵护。
二、园林绿化施工工艺分析。
在进行园林绿化工程施工过程中应该加大对植物种植的重视。在植物种植过程中,不同于对其他建筑材料的选择,绿色植物的选择有自己独特的特点。要严格按照设计要求进行绿色植物的选择,所选植物的品种不仅应该符合设计图纸的要求,还应该符合其他方面对植物的要求。在实际施工过程中,施工单位应该严格按照图纸进行植物的施工,这样才能体现设计者的设计理念,达到预期的效果。在对植物的品种、大小按照图纸选择好以后,还有选择生长旺盛、没有病害的植物进行种植。购买以后,在运输过程中为了提高植物的存活率,应该注意对植物根茎、枝叶等的保护。
2.1、园林绿色施工过程中植物栽培技术分析。
将植物的栽培时要选择合理的时间,要在专业人员的指导下进行种植,合理地安排种植顺序,将地下、地上;道路、铺装与苗木的栽植顺序制定出种植进度计划表。为了加快施工进度,可以选择两季栽植的施工方法,秋冬季和春季栽植,根据苗木发芽的早晚和苗源的远近合理安排;对大规格苗木及重点地段苗木的精心养护;适时栽植不仅可以提高植物的成活率,加快施工进度还可以缩减对植物的养护费用,缩减施工成本,提高经济效益。这样就可以保证以最低的成本投入来获得较高的工程质量。
2.2、园林绿色施工过程中应两季栽植,适时栽培。
在进行植物栽培过程中应该根据树木栽植成活的原理,植树应选择在蒸腾作用欠旺盛蒸腾量少、有利于根系恢复生长和吸收、易于维持水平代谢平衡的时期。就大多数地区而言,春季和秋季都是适宜移栽的季节。
经过预掘的苗木,或假植苗、容器苗等,一年四季均可栽植,不仅成活率高,且可最大限度的保留枝和叶,观赏效果颇佳。秋冬季和春季栽植,根据苗木发芽的早晚和苗源的远近合理安排;对大规格苗木及重点地段苗木的精心养护;适时栽植与养护费用的关系及对成活率的影响。
根据植物的生长特点,成活原理选择春季、雨季栽植。连续多日的雨天后,土壤含水量过多通气不良,栽植作业使土壤泥泞,不利于新根恢复生长,并易引起根系腐烂,尤其是土质粘重的地方,应待雨停后2~3天再栽植。秋季栽植,通常在越冬前根系有一个小的生长高峰,这些条件都有利于栽植初期的水分平衡和根系恢复。
三、加强园林施工的进度控制。
3.1、通过拟定施工计划来控制进度。
由于园林工程在施工过程中很容易出现多单位交叉作业的现象,园林工程的施工场地也会被大量的占用。交叉作业以及场地被占用都会导致园林工程的施工进度在一定程度上被限制。在实际施工过程中,水景、土建、道路面层、照明、绿化等其中的每一个工程延期完成都会造成整个园林工程的施工进度延期。为了保证施工进度的顺利进行,各个施工单位之间应该加强沟通,制定合理的进度计划、合理安排各施工过程的关系才能有效的控制进度计划。
做好应对措施来保证工程进度。
在实际施工过程中,施工进度还会受天气的影响。在进行苗木种植以及土方整理时一旦遇到雨天就会受到严重的影响。为了避免天气情况对施工进度的影响在制定施工进度计划的过程中应该成分考虑到施工期间的天气变化对施工进度的影响,并据此制定出合理的防范措施和应急计划。通过制定防范措施来预防天气变化等特殊情况对施工进度的影响。
通过提高管理人员的水平来保证工程进度。
项目部管理人员的管理水平能否达到要求,是否能够制定出合理的施工组织计划以及合理的平面布置图,能否合理的配置劳动力以及施工机械等等,都对园林工程的施工进度有著极其重要的影响。为了保证施工进度的顺利展开,应该不断提高管理人员的综合素质、技术水平,管理人员还应该在工作中不断地积累经验,并加强学习。
工程进度控制的主要措施
3.4、利用现代管理手段进行进度控制。
为了有效保证园林工程施工进度的顺利展开,可以从组织措施、合同措施、技术措施以及经济和信息管理措施几个方面进行控制。
3.4.1、组织措施。上文中已经提到园林工程建筑的规模较大、所涉及的工种较多,在整个建筑工程中,可能需要多个不同性质的施工单位共同来施工。除此之外,应该掌握好各施工阶段的关联性,做好各阶段的有机结合,这有这样才能保证整个施工进度计划的合理性,保证园林绿化工程能按照预计的工期完工。为了保证应该做好组织措施,合理安排各施工单位的施工计划,合理组织安排。
3.4.2.、合同措施。为了使得进度计划得到有效的控制,应该加强对合同的管理,保证合同总工期与进度合同之间的一致性。
3.4.3、技术措施。为了保证进度计划在进行调整之后依然按时竣工,应该加强施工进度计划的技术措施。将进度计划要与园林建设施工现场的地理情况、天气情况、施工人员等各种因素有机的结合起来。按照这些因素制定出合理的园林绿化进度计划,合理安排地下、地上;道路、铺装与苗木的栽植。并将整个规划划分成若干部分,并根据每个部分绿化植物的生长特点、栽培情况制定出适合本阶段的进度计划。
3.4.4、经济和信息管理措施。在园林工程的整个施工过程中应该加强对全过程的监测、调整、分析和反馈并且要建立进度控制过程中的信息流动,并且要做好信息管理工作。
结束语:文章中笔者结合多年的工作经验对园林施工过程中的施工特点、园林绿化施工的技术分析以及施工进度的保证措施进行了简要的介绍。加强园林绿化工程建设符合人们对居住环境的绿化需求,符合当代环境保护以及生态化发展的需求。