论文部分内容阅读
通过地质雷达探测及相应的地质分析, 得出了杨庄矿“一号陷落柱”在8 煤原预测位置确实不存在的结论, 从而为巷道合理布置及安全回采提供了依据。
Through the geological radar detection and the corresponding geological analysis, it is concluded that the “No.1 collapse column” of Yangzhuang Mine did not exist at the predicted location of 8 coal originally, which provided the basis for the rational arrangement of the roadway and safe recovery.