抽水蓄能电站在电力系统中发挥着“削峰填谷”功能 ,对其机组的控制提出了一系列特殊的要求 ,如监控测点显著增多、工况转换特别复杂、多台主设备联合控制、全新的经济调度方式 ,以及对同期等装置的特殊要求等。文中分析了上述特性 ,并从抽水蓄能电站计算机监控系统设计要求出发 ,讨论了多对象的联合控制、联合抽水优化控制、高可靠性技术等问题 ,给出了适用的计算机监控系统的结构配置
Pumped storage power station plays a “peak load shifting” function in the power system, and puts forward a series of special requirements for the control of its generating units. For example, the monitoring points are significantly increased, the working condition conversion is particularly complicated, and multiple main equipment joint control , A new mode of economic dispatch, and special requirements for devices such as the same period. The above characteristics are analyzed in this paper. Based on the design requirements of computer monitoring system for pumped storage power station, the multi-object joint control, combined pumping optimization control and high reliability technology are discussed. The structural configuration of applicable computer monitoring system