高淳县污水处理厂现状规模为2×104m3/d,扩建后规模为4×104m3/d。原设计出水水质执行一级B标准,改造扩建后出水水质达到一级A标准。工程建设内容主要包括:①新建1座4×104m3/d的配水井;②新建1座2×104m3/d的旋流沉砂池;③新建1座2×104m3/d的A2/O氧化沟;④新建1座4×104m3/d?
The current status of Gaochun Sewage Treatment Plant is 2 × 104m3 / d, and the expanded scale is 4 × 104m3 / d. The original design of water quality implementation of a B standard, after the renovation of the water quality reached a level A standard. Construction of the project mainly includes: ① newly-built 4 × 104m3 / d distribution wells; ② newly built 1 × 104m3 / d cyclone grit chamber; ③ newly built 2 × 104m3 / d A2 / O oxidation ditches ; ④ a new 4 × 104m3 / d?