论文部分内容阅读
通过在新庄孜矿六方堤进行的水力冲填土试验及测试成果,分析研究冲填土强度的变化与脱水固结时间、含水率及土料性质等因素之间的内在联系,为地表水体下采煤进行水力冲填法筑堤工程施工设计及工期预算提供参考。
Through the hydraulic pop-in soil test and test results carried out at Liufangdi of Xinzhuangzi Mine, the inter-relationship between the change of the strength of filled-in soil and the dehydration and consolidation time, moisture content and soil properties was analyzed. Coal mining hydraulic filling method of embankment construction design and project budget for reference.