论文部分内容阅读
随着建筑工程发展的客观要求更高,人们需要的建筑物质量越来越高,针对很多建筑结构部件的预制要求也逐渐的增多,很多构件是在工厂的流水线上组装建造完毕后直接运至施工现场使用,这就大大提高了施工的效率,其中具有装配结构和整体式的剪力墙预制构件成为了很多建筑工程首选的建筑结构部件,也促进了相应施工技术的改造和优化。
As the objective requirements for the development of construction projects are higher, the quality of the buildings required by people is getting higher and higher, and the requirements for the prefabrication of many building structural components are gradually increasing. Many components are shipped directly after assembly on the assembly line of the factory. The use of the construction site greatly increases the efficiency of the construction. Among them, the assembly structure and the integrated shear wall prefabricated components have become the preferred building structural components for many construction projects, and also promote the transformation and optimization of the corresponding construction technology.