【摘 要】 由于高层建筑工程所需的混凝土的总量大,强度高。 因此,为确保浇筑施工的工期,不仅需要配备相当数量的土泵机和布料机,同时对混凝土的配比也有相当高的要求。目前,国内的高泵程混凝土采用的掺粉煤灰和化学外加剂的双渗技术,保证了高层建筑对混凝土配合比設计的要求以及泵送设备等相关设备的要求,混凝土的泵送高度也随之升高,现在所采用的泵送到顶技术可将混凝土直接泵送到预设浇筑高度,使高层建筑的施工效率得到大幅提升。
【关键词】高层建筑;混凝土;施工
【Abstract】because of the high-rise building construction needs large amount of concrete, high strength. Therefore, in order to ensure the casting construction time limit for a project, not only need to pump and cloth machine equipped with a number of soil, at the same time also has very high requirements for the ratio of concrete. At present, the domestic high pump lift by mixing fly ash and chemical admixture of concrete double infiltration technology, ensures the high-rise construction requirement for design of concrete and to meet the requirements of pumping equipment and related equipment, concrete pumping height also will increase, now pump to the top technology can be adopted by the concrete pump directly to the default height of pouring, the high-rise building construction efficiency was improved.
【Keywords】 high-rise building concrete construction
一、高层建筑混凝土施工技术的要求
在高层建筑混凝土施工过程中,首先要保证做好内部、外部的控制协调与配合工作。要做好各专业之间的协调配合工作,首先必须要了解和掌握各专业的总体及阶段的特性,以便在实际施工组织中能够合理、有序、有效地安排各专业交叉施工。外部的协调与配合则主要指的是土建单位和装修单位之间的协调与配合。做好各方面的控制协调工作是保证高层建筑混凝土施工达到规定技术要求的前提和基础。对施工技术的要求主要体现在这些方面:由于需要混凝土质量高、数量大,应尽量采用预拌泵送混凝土,如工程需要适当提前浇筑后浇带混凝土,应采取有效措施,并取得设计单位同意;混凝土施工缝留置的具体位置和浇筑必须符合本规程和有关现行国家标准的规定;高性能混凝土以耐久性为基本要求,并根据不同用途强化某些性能,形成补偿收缩混凝土、自密实免振混凝土等;进度配合方面。要达到施工的进度要求,必须根据工程的阶段特性,合理、有序地安排施工人员进入作业面施工。由于高层建筑其本身的特殊性,在施工过程中,任何一个环节出现了失误都会造成很大的影响,甚至还有些时候,一个环节的失误根本就没法进行修改弥补。所以在开展高层建筑施工时,要以严谨认真的态度对待每一个细小的环节。
二、混凝土工程施工技术
1、混凝土工程开工前,应根据设计要求做级配实验、配合比实验,实验过程中同时要采取相应的措施严格控制、严格执行不同强度等级混凝土的初步配合比计算和基准配合比的试配调整与确定,以此作为实际施工中的参照标准。
2、在测定所到场混凝土的温度、坍落度、和易性等都符合要求,且不存在分层、泌水、离析等问题后,即可进行混凝土的浇筑。浇筑要按混凝土自然流淌坡度、斜面分层、连续逐层推移、一次到顶的方法进行,厚度必须符合规范、设计要求,时间要按其缓凝时间予以确定。同时,要保证混凝土初凝前都确保被上层混凝土覆盖,保证上下层浇筑间隔不超过混凝土初凝时间,避免施工冷缝出现。
3、混凝土振捣时,振动器插点必须按一定顺序有规律均匀排列、插棒,可采用“行列式”或“交错式”的次序移动,以免造成混乱而发生漏振。振捣时应按“坡脚和坡顶同时向坡中振捣”方式进行,层间不宜形成混凝土缝,振捣时间不宜过长、亦不宜过短,应以混凝土表面呈水平不再显著下沉,不再出现气泡,表面泛出灰浆为准。
4、高层建筑多采用具有改善混凝土施工性能、缩短施工周期等特点的泵送混凝土,采用此种形式,不仅要严格控制浇筑、振捣,最重要的是严格执行养护制度。养护中要根据规定,按照不同水泥品种和混凝土的要求确定养护时间,而对于大体积混凝土的养护则应根据气候条件按施工技术方案采取控温措施。另外,养护要有专业人员予以负责。
三、加强高层建筑施工质量的措施
1、编制详细的施工组织设计方案
施工单位应针对高层建筑的特点编制严谨、详尽的施工组织和管理方案。用来指导整个施工过程。内容包括:施工工序的安排,各工种进入工地的时间,关键部位的施工方法,对易出现的质量问题提出预控措施,制定出成品保护措施等。
2、加强质量管理
(1)严把材料质量关。材料要符合国家规范标准和设计要求,对进场的原材料要实行严格的试验检测,不合格的材料坚决不能用于施工。 (2)选择高水平的施工队伍。施工队伍素质的高低直接影响工程质量的好坏。一个项目工程建设立项批准之后,必然经过招投标、或议标选择施工队伍,具体方法:一是听,即听取施工队介绍技术力量、设备、资金情况以及拟承担工程所采取的措施。二是看,看正在施工和已经竣工交付使用项目的施工质量和现场管理。三是查,即考察施工单位的设备、技术力量、企业等级、资格证书。四是访,即走访已交付使用工程的甲方,征求使用单位对工程队伍的评价,以便了解其信誉。在此基础上,按照标价合理、工期短、质量优、信誉高、素质好的原则,综合比较绝不能靠关系,走后门,特别要防止通过关系指定施工队伍。
3、做好施工阶段的进度控制
由于现代高层建筑具有规模庞大,工程结构与工艺复杂,建设周期长及相关单位多等特点,决定了工程进度将受到许多因素的影响,要想有效地控制工程进度,就必须对影响进度的有利因素和不利因素进度全面、细致的分析和预测。这样一方面可以促进对有利因素的充分利用和对不利因素的預防;另一方面也便于来制定预防措施,事中采取有效对策,事后进度妥善补救,以缩小实际进度与计划进度的偏差,实现对高层建筑进度的静态控制和动态控制。高层建筑施工进度是一个动态实施过程。施工进度计划在实施过程中,会因为新情况的产生,各种干扰因素和风险因素的作用面发生变化,使人们难以在执行过程中检查工程项目实际进度发展情况,并将实际状况与计划安排进度做一对比,从中得出偏离计划的信息,然后在分析偏差及其产生原因的基础上,通过采取组织、技术、经济等措施维待原计划的正常实施。如果采取措施后不能维待原计划,则需要对原计划进度调整和修正,再按照新的进度计划实施。
4、将安全生产落到实处高层建筑施工,存在许多不同于一般建筑工程施工的危险因素。高层建筑的施工都是高空作业,作业难度大,交叉作业多。
总结:
房屋建筑质量不仅会影响到社会经济的发展,更关系到人民的生命健康。因此,在高层房屋建筑施工的过程中要严把每道施工的工序,保证施工的质量。同时灵活地将建筑与结构统一以确保整个高层建筑工程的质量。
参考文献:
【1】蒋学勤.也论高层建筑施工技术[J].价值工程,2010,(24).
【2】苏文雄.高层建筑施工技术浅析[J].中国高新技术企业,2010,(31).
【3】肖华军.高层建筑施工技术策略探讨[J].中国城市经济,2011,(17).
【关键词】高层建筑;混凝土;施工
【Abstract】because of the high-rise building construction needs large amount of concrete, high strength. Therefore, in order to ensure the casting construction time limit for a project, not only need to pump and cloth machine equipped with a number of soil, at the same time also has very high requirements for the ratio of concrete. At present, the domestic high pump lift by mixing fly ash and chemical admixture of concrete double infiltration technology, ensures the high-rise construction requirement for design of concrete and to meet the requirements of pumping equipment and related equipment, concrete pumping height also will increase, now pump to the top technology can be adopted by the concrete pump directly to the default height of pouring, the high-rise building construction efficiency was improved.
【Keywords】 high-rise building concrete construction
一、高层建筑混凝土施工技术的要求
在高层建筑混凝土施工过程中,首先要保证做好内部、外部的控制协调与配合工作。要做好各专业之间的协调配合工作,首先必须要了解和掌握各专业的总体及阶段的特性,以便在实际施工组织中能够合理、有序、有效地安排各专业交叉施工。外部的协调与配合则主要指的是土建单位和装修单位之间的协调与配合。做好各方面的控制协调工作是保证高层建筑混凝土施工达到规定技术要求的前提和基础。对施工技术的要求主要体现在这些方面:由于需要混凝土质量高、数量大,应尽量采用预拌泵送混凝土,如工程需要适当提前浇筑后浇带混凝土,应采取有效措施,并取得设计单位同意;混凝土施工缝留置的具体位置和浇筑必须符合本规程和有关现行国家标准的规定;高性能混凝土以耐久性为基本要求,并根据不同用途强化某些性能,形成补偿收缩混凝土、自密实免振混凝土等;进度配合方面。要达到施工的进度要求,必须根据工程的阶段特性,合理、有序地安排施工人员进入作业面施工。由于高层建筑其本身的特殊性,在施工过程中,任何一个环节出现了失误都会造成很大的影响,甚至还有些时候,一个环节的失误根本就没法进行修改弥补。所以在开展高层建筑施工时,要以严谨认真的态度对待每一个细小的环节。
二、混凝土工程施工技术
1、混凝土工程开工前,应根据设计要求做级配实验、配合比实验,实验过程中同时要采取相应的措施严格控制、严格执行不同强度等级混凝土的初步配合比计算和基准配合比的试配调整与确定,以此作为实际施工中的参照标准。
2、在测定所到场混凝土的温度、坍落度、和易性等都符合要求,且不存在分层、泌水、离析等问题后,即可进行混凝土的浇筑。浇筑要按混凝土自然流淌坡度、斜面分层、连续逐层推移、一次到顶的方法进行,厚度必须符合规范、设计要求,时间要按其缓凝时间予以确定。同时,要保证混凝土初凝前都确保被上层混凝土覆盖,保证上下层浇筑间隔不超过混凝土初凝时间,避免施工冷缝出现。
3、混凝土振捣时,振动器插点必须按一定顺序有规律均匀排列、插棒,可采用“行列式”或“交错式”的次序移动,以免造成混乱而发生漏振。振捣时应按“坡脚和坡顶同时向坡中振捣”方式进行,层间不宜形成混凝土缝,振捣时间不宜过长、亦不宜过短,应以混凝土表面呈水平不再显著下沉,不再出现气泡,表面泛出灰浆为准。
4、高层建筑多采用具有改善混凝土施工性能、缩短施工周期等特点的泵送混凝土,采用此种形式,不仅要严格控制浇筑、振捣,最重要的是严格执行养护制度。养护中要根据规定,按照不同水泥品种和混凝土的要求确定养护时间,而对于大体积混凝土的养护则应根据气候条件按施工技术方案采取控温措施。另外,养护要有专业人员予以负责。
三、加强高层建筑施工质量的措施
1、编制详细的施工组织设计方案
施工单位应针对高层建筑的特点编制严谨、详尽的施工组织和管理方案。用来指导整个施工过程。内容包括:施工工序的安排,各工种进入工地的时间,关键部位的施工方法,对易出现的质量问题提出预控措施,制定出成品保护措施等。
2、加强质量管理
(1)严把材料质量关。材料要符合国家规范标准和设计要求,对进场的原材料要实行严格的试验检测,不合格的材料坚决不能用于施工。 (2)选择高水平的施工队伍。施工队伍素质的高低直接影响工程质量的好坏。一个项目工程建设立项批准之后,必然经过招投标、或议标选择施工队伍,具体方法:一是听,即听取施工队介绍技术力量、设备、资金情况以及拟承担工程所采取的措施。二是看,看正在施工和已经竣工交付使用项目的施工质量和现场管理。三是查,即考察施工单位的设备、技术力量、企业等级、资格证书。四是访,即走访已交付使用工程的甲方,征求使用单位对工程队伍的评价,以便了解其信誉。在此基础上,按照标价合理、工期短、质量优、信誉高、素质好的原则,综合比较绝不能靠关系,走后门,特别要防止通过关系指定施工队伍。
3、做好施工阶段的进度控制
由于现代高层建筑具有规模庞大,工程结构与工艺复杂,建设周期长及相关单位多等特点,决定了工程进度将受到许多因素的影响,要想有效地控制工程进度,就必须对影响进度的有利因素和不利因素进度全面、细致的分析和预测。这样一方面可以促进对有利因素的充分利用和对不利因素的預防;另一方面也便于来制定预防措施,事中采取有效对策,事后进度妥善补救,以缩小实际进度与计划进度的偏差,实现对高层建筑进度的静态控制和动态控制。高层建筑施工进度是一个动态实施过程。施工进度计划在实施过程中,会因为新情况的产生,各种干扰因素和风险因素的作用面发生变化,使人们难以在执行过程中检查工程项目实际进度发展情况,并将实际状况与计划安排进度做一对比,从中得出偏离计划的信息,然后在分析偏差及其产生原因的基础上,通过采取组织、技术、经济等措施维待原计划的正常实施。如果采取措施后不能维待原计划,则需要对原计划进度调整和修正,再按照新的进度计划实施。
4、将安全生产落到实处高层建筑施工,存在许多不同于一般建筑工程施工的危险因素。高层建筑的施工都是高空作业,作业难度大,交叉作业多。
总结:
房屋建筑质量不仅会影响到社会经济的发展,更关系到人民的生命健康。因此,在高层房屋建筑施工的过程中要严把每道施工的工序,保证施工的质量。同时灵活地将建筑与结构统一以确保整个高层建筑工程的质量。