摘要:随着经济的快速发展,社会的不断进步,建筑行业有了更高的发展。自生态化以及绿色生活理念的不断深入人心,人们对居住环境的绿化程度、生态型有了更高的要求。园林建设工程顺应时代的发展潮流高速发展起来。文章中笔者结合多年的工作经验对园林施工的特点进行了简要介绍。并对几种常见的园林施工技术进行简要的介绍。并对园林的施工质量保证措施进行了讲述。
关键词:园林建设工程;施工技术分析;质量保证措施。
Abstract:: with the rapid development of economy, the progress of the society, the development of construction industry has a higher. Since the concept of ecological and green life unceasingly thorough popular feeling, people's living environment greening degree, ecotype had the higher request. Landscape construction engineering keep up with the trend of the development of the era of rapid development. In the article the author combined with years of experience on the characteristics of the botanical garden construction are briefly introduced. And the garden of several common construction techniques were introduced briefly. And the botanical garden construction quality assurance measures.
Key words: landscape construction engineering; Analysis of the construction technology; Quality assurance measures.
中图分类号:TU74文献标识码:A文章编号:
前言:园林建筑工程除了进行传统的建筑之外,还需要进行景观的建设。由于园林建设是近几年兴起的,园林施工人员的技术水平不足,施工经验缺乏,导致施工过程中经常出现质量问题以及与设计不符的现象。为了解决这一现象,笔者对园林建设过程中的常用技术进行了简要的介绍,并对园林建设质量保证措施进行了概述,希望对同类工程的施工有所帮助。
一、园林工程施工技术的特点。
园林工程建设不同于传统的建筑施工技术。为了保证园林施工过程的顺利进行,有效保证工程质量以及工程进度,首先应该了解园林施工的特点。为了更好地理解园林建筑施工管理各方面的内容笔者首先对园林工程的施工特点进行简要的介绍。无论是园林建设项目的施工还是某个单位工程的施工都属于园林工程施工项目的范畴。举例进行解释,无论是一个公园的建设,还是公园中的绿化种植工程都属于园林建筑施工。下面笔者从五个方面对园林建筑的施工特点进行介绍:首先园林建筑施工项目属于建设项目,它的任务即包括单项工程也包括单位工程;第二,园林建筑工程的施工主体是施工单位;第三,工程合同所确定的内容是园林建筑施工的任务;第四,园林建筑施工具有生产周期长、施工周期短的特点,并且具有建筑面积大、结构复杂多样、涵盖面广以及固定性等特点;第五,园林建筑工程不同于一般的民间工程、市政工程,它的施工对象是具有生命的实体,为了保证植物的茁壮成长,保证其成活率,必须对其进行精心的呵护。
二、园林施工过程中常用的施工技术。
2.1、植物的修剪技术。
众所周知,园林建设工程中有大量的植物,对园林植物的修建工作对植物的生长以及美观都有着极为重要的意义。通过对植物进行修剪可以保证植物的形态正常,并且可以保证治污减的通风顺畅,同时达到了对绿色景观的要求。修剪过程中应根据不同植物的生长特点进行。修剪工作应该在植物开花之后进行,减掉老枝、弱枝、病枝,并对植物的形态进行修剪,并通过搭配其他植物来进行点缀。在保证植物茁壮成长的同时起到美观的效果。
2.2、园林中的灌溉施工技术。
为了保证灌溉的均匀,就必须做好施工放样工作。下面笔者对灌溉施工技术应遵循的原则进行简要的介绍。第一,为了保证园林工程的喷灌系统的质量,就应该严格按照设计图纸进行施工,这是保障喷灌质量以及园林工程质量的必要条件。第二,喷灌系统的设置是为园林绿化工程所建立的配套设施。由于园林绿化工程的施工过程具有一定的随意性,并且绿化工程还具有一定的季节性。所以在进行施工过程中要根据实际情况对设计方案进行改进。第三,根据实地考察工作,对放映地形进行考察,找出实际场地与设计图纸的不同之处,然后进行放样控制点并确定放样方法。
三、园林工程质量的保证措施。
园林建设施工质量管理的目标是保证园林建设的施工质量符合设计要求以及相关规范的质量要求。通过对园林工程的质量进行管理,来创造出环境优美、舒适的生活环境。下面笔者通过对园林的整个施工过程进行质量控制。
3.1、通过对园林施工前的管理来控制施工质量。
為了有效保证园林施工质量,就必须加强对园林施工之前的控制。在进行园林施工之前要求施工人员认真研读施工图纸,并对施工现场进行勘察,并施工现场的道路交通以及水资源进行详细的了解,并认真分析设计者对园林建设的意图。根据施工前的准备工作拟定合理的施工计划以及管理方案。由于园林施工较为复杂,施工难度巨大。所以做好施工前的准备工作,对保证施工过程的顺利开展有着重要的意义。园林工程施工组织设计一般包括以下几个方面的内容:工程概况、
施工技术,施工机械设备、劳动力、工程程序进度内容。除此之外,还应进行园林绿化的施工计划,主要包括对施工队伍进行合理的分工以及任务和责任的划分等;并且要做好设计图的布置以及安全质量措施准备等一系列的施工前准备工作,来确保园林施工的顺利开展。
3.2、通过对园林施工过程的管理来控制施工质量。
做好施工前的准备工作之后,就要对园林的施工过程进行质量控制,这是保证园林施工质量的重要部分。在准备阶段已经做好了施工进度计划,然后根据进度计划制定了相应的质量控制计划,并对园林施工过程中影响园林工程质量的人员、材料、机械设备、施工工艺等一系列的因素进行了控制,通过这些了保证园林工程的质量符合设计以及规范要求。
在园艺工程的施工管理过程中,组织协调工作有着极为重要的作用。组织协调工作的顺利开展能有效的解决施工过程中出现的矛盾和问题,通过组织协调工作还可以有效地处理施工过程中各方面的关系,使得园林施工的进度、质量、成本都得到有效地控制。组织协调工作应该坚持相互信任、共同负责、相互支持以及相互尊重原则,这有这样才能从最大程度上缩减工期、提高质量、降低成本。下面以对苗木的选择、假植以及管理工作对园林施工过程中的质量控制进行介绍。
3.2.1、通过对苗木的选择来控制施工质量。
对于植物的选择应该严格按照设计图纸进行选购,并应对进场子午的品种、数量、产地、规格以及苗木检疫单进行严格的检查,保证植物符合相应的质量要求以及绿化条例规定的质量要求。以乔木的选择为例,应该选择树干通直,枝繁叶茂,杆茎粗壮,分叉均匀,没有损伤折断,土球完整,没有病虫害的植物。
3.2.2、通过对苗木假植管理来进行园林施工质量的控制。
苗木假植过程中,首先要选择土壤质量料号、避阴背风以及水资源充足的地方进行苗木的假植。假植过程中,首先将假植沟挖到25厘米左右,然后将苗木按捆成行摆放,摆好一行之后进行培土。要保证培土质量,避免出现漏根透风,降低苗木的成活率。培土完成以后浇足水,然后盖好遮蔽物。之后每天给苗木充足的浇水两次。施工人员取苗之后,必须做好假植厂的整理工作,避免出现土壤的松动、透风现象。
3.2.3、通过对造林作业中苗木管理来进行园林质量的控制。
造林过程中,必须将苗木装进苗木桶中,保证苗木桶中有三分之一的水,这样就可以使苗木的根能够浸入水中,经过吸水剂处理的苗木不需浸水。种植过程中,应种完一棵再取下一棵,出现苗木质量不合格以及病苗、死苗应该将其扔掉。
3.3、通过对园林的竣工验收与养护阶段的管理来控制施工质量。
园林工程施工结束之后,应认真按照相关的质量标准进行竣工验收工作,并做好资料的整理与收集工作,把好園林工程质量控制的最后一关。竣工验收结束以后,还有加强养护阶段的工作,定期对植物进行修剪、清理、施肥、浇水等工作。为了提高园林绿色植物的成活率需要对植物进行精心的养护工作,保证植物处于良好的生长环境,并对植物进行定期的修剪和清理工作来达到设计的景观效果。
结束语:文章中笔者首先对园林建设施工技术的综合性、多学科性进行了介绍,指出了园林建设施工技术的多样性以及复杂性。之后对园林施工过程中常用的修剪技术以及灌溉技术进行了介绍。为了保证园林工程质量从施工全过程对园林工程质量进行控制和管理,希望对今后的同类工程提供帮助。
参考文献:
【1】董观志,李立志.近十年来国内园林研究综述[J].商业研究,2006:16-19.
【2】汪建平,王志成.园林绿化施工质量管理办法的探索.中国园林,2005年,3.[12]
【3】陈劲元,黄彩云.谈谈园林绿化工程的施工与管理.中山大学学报论丛,2002年,3期.
关键词:园林建设工程;施工技术分析;质量保证措施。
Abstract:: with the rapid development of economy, the progress of the society, the development of construction industry has a higher. Since the concept of ecological and green life unceasingly thorough popular feeling, people's living environment greening degree, ecotype had the higher request. Landscape construction engineering keep up with the trend of the development of the era of rapid development. In the article the author combined with years of experience on the characteristics of the botanical garden construction are briefly introduced. And the garden of several common construction techniques were introduced briefly. And the botanical garden construction quality assurance measures.
Key words: landscape construction engineering; Analysis of the construction technology; Quality assurance measures.
中图分类号:TU74文献标识码:A文章编号:
前言:园林建筑工程除了进行传统的建筑之外,还需要进行景观的建设。由于园林建设是近几年兴起的,园林施工人员的技术水平不足,施工经验缺乏,导致施工过程中经常出现质量问题以及与设计不符的现象。为了解决这一现象,笔者对园林建设过程中的常用技术进行了简要的介绍,并对园林建设质量保证措施进行了概述,希望对同类工程的施工有所帮助。
一、园林工程施工技术的特点。
园林工程建设不同于传统的建筑施工技术。为了保证园林施工过程的顺利进行,有效保证工程质量以及工程进度,首先应该了解园林施工的特点。为了更好地理解园林建筑施工管理各方面的内容笔者首先对园林工程的施工特点进行简要的介绍。无论是园林建设项目的施工还是某个单位工程的施工都属于园林工程施工项目的范畴。举例进行解释,无论是一个公园的建设,还是公园中的绿化种植工程都属于园林建筑施工。下面笔者从五个方面对园林建筑的施工特点进行介绍:首先园林建筑施工项目属于建设项目,它的任务即包括单项工程也包括单位工程;第二,园林建筑工程的施工主体是施工单位;第三,工程合同所确定的内容是园林建筑施工的任务;第四,园林建筑施工具有生产周期长、施工周期短的特点,并且具有建筑面积大、结构复杂多样、涵盖面广以及固定性等特点;第五,园林建筑工程不同于一般的民间工程、市政工程,它的施工对象是具有生命的实体,为了保证植物的茁壮成长,保证其成活率,必须对其进行精心的呵护。
二、园林施工过程中常用的施工技术。
2.1、植物的修剪技术。
众所周知,园林建设工程中有大量的植物,对园林植物的修建工作对植物的生长以及美观都有着极为重要的意义。通过对植物进行修剪可以保证植物的形态正常,并且可以保证治污减的通风顺畅,同时达到了对绿色景观的要求。修剪过程中应根据不同植物的生长特点进行。修剪工作应该在植物开花之后进行,减掉老枝、弱枝、病枝,并对植物的形态进行修剪,并通过搭配其他植物来进行点缀。在保证植物茁壮成长的同时起到美观的效果。
2.2、园林中的灌溉施工技术。
为了保证灌溉的均匀,就必须做好施工放样工作。下面笔者对灌溉施工技术应遵循的原则进行简要的介绍。第一,为了保证园林工程的喷灌系统的质量,就应该严格按照设计图纸进行施工,这是保障喷灌质量以及园林工程质量的必要条件。第二,喷灌系统的设置是为园林绿化工程所建立的配套设施。由于园林绿化工程的施工过程具有一定的随意性,并且绿化工程还具有一定的季节性。所以在进行施工过程中要根据实际情况对设计方案进行改进。第三,根据实地考察工作,对放映地形进行考察,找出实际场地与设计图纸的不同之处,然后进行放样控制点并确定放样方法。
三、园林工程质量的保证措施。
园林建设施工质量管理的目标是保证园林建设的施工质量符合设计要求以及相关规范的质量要求。通过对园林工程的质量进行管理,来创造出环境优美、舒适的生活环境。下面笔者通过对园林的整个施工过程进行质量控制。
3.1、通过对园林施工前的管理来控制施工质量。
為了有效保证园林施工质量,就必须加强对园林施工之前的控制。在进行园林施工之前要求施工人员认真研读施工图纸,并对施工现场进行勘察,并施工现场的道路交通以及水资源进行详细的了解,并认真分析设计者对园林建设的意图。根据施工前的准备工作拟定合理的施工计划以及管理方案。由于园林施工较为复杂,施工难度巨大。所以做好施工前的准备工作,对保证施工过程的顺利开展有着重要的意义。园林工程施工组织设计一般包括以下几个方面的内容:工程概况、
施工技术,施工机械设备、劳动力、工程程序进度内容。除此之外,还应进行园林绿化的施工计划,主要包括对施工队伍进行合理的分工以及任务和责任的划分等;并且要做好设计图的布置以及安全质量措施准备等一系列的施工前准备工作,来确保园林施工的顺利开展。
3.2、通过对园林施工过程的管理来控制施工质量。
做好施工前的准备工作之后,就要对园林的施工过程进行质量控制,这是保证园林施工质量的重要部分。在准备阶段已经做好了施工进度计划,然后根据进度计划制定了相应的质量控制计划,并对园林施工过程中影响园林工程质量的人员、材料、机械设备、施工工艺等一系列的因素进行了控制,通过这些了保证园林工程的质量符合设计以及规范要求。
在园艺工程的施工管理过程中,组织协调工作有着极为重要的作用。组织协调工作的顺利开展能有效的解决施工过程中出现的矛盾和问题,通过组织协调工作还可以有效地处理施工过程中各方面的关系,使得园林施工的进度、质量、成本都得到有效地控制。组织协调工作应该坚持相互信任、共同负责、相互支持以及相互尊重原则,这有这样才能从最大程度上缩减工期、提高质量、降低成本。下面以对苗木的选择、假植以及管理工作对园林施工过程中的质量控制进行介绍。
3.2.1、通过对苗木的选择来控制施工质量。
对于植物的选择应该严格按照设计图纸进行选购,并应对进场子午的品种、数量、产地、规格以及苗木检疫单进行严格的检查,保证植物符合相应的质量要求以及绿化条例规定的质量要求。以乔木的选择为例,应该选择树干通直,枝繁叶茂,杆茎粗壮,分叉均匀,没有损伤折断,土球完整,没有病虫害的植物。
3.2.2、通过对苗木假植管理来进行园林施工质量的控制。
苗木假植过程中,首先要选择土壤质量料号、避阴背风以及水资源充足的地方进行苗木的假植。假植过程中,首先将假植沟挖到25厘米左右,然后将苗木按捆成行摆放,摆好一行之后进行培土。要保证培土质量,避免出现漏根透风,降低苗木的成活率。培土完成以后浇足水,然后盖好遮蔽物。之后每天给苗木充足的浇水两次。施工人员取苗之后,必须做好假植厂的整理工作,避免出现土壤的松动、透风现象。
3.2.3、通过对造林作业中苗木管理来进行园林质量的控制。
造林过程中,必须将苗木装进苗木桶中,保证苗木桶中有三分之一的水,这样就可以使苗木的根能够浸入水中,经过吸水剂处理的苗木不需浸水。种植过程中,应种完一棵再取下一棵,出现苗木质量不合格以及病苗、死苗应该将其扔掉。
3.3、通过对园林的竣工验收与养护阶段的管理来控制施工质量。
园林工程施工结束之后,应认真按照相关的质量标准进行竣工验收工作,并做好资料的整理与收集工作,把好園林工程质量控制的最后一关。竣工验收结束以后,还有加强养护阶段的工作,定期对植物进行修剪、清理、施肥、浇水等工作。为了提高园林绿色植物的成活率需要对植物进行精心的养护工作,保证植物处于良好的生长环境,并对植物进行定期的修剪和清理工作来达到设计的景观效果。
结束语:文章中笔者首先对园林建设施工技术的综合性、多学科性进行了介绍,指出了园林建设施工技术的多样性以及复杂性。之后对园林施工过程中常用的修剪技术以及灌溉技术进行了介绍。为了保证园林工程质量从施工全过程对园林工程质量进行控制和管理,希望对今后的同类工程提供帮助。