论文部分内容阅读
介绍东海大桥近岛段工程8×50m曲线顶推梁钢导梁的设计与施工,分析控制钢导梁设计的关键因素,并在实际施工中提出解决方案。
This paper introduces the design and construction of 8 × 50m curvilinear girders for the near-island section of the Donghai Bridge, analyzes the key factors that control the design of the girder, and proposes the solution in practical construction.