淮阴复线船闸工程总土方量为331万立方米,其中闸塘和上、下引航道的大部分水上土方工程采用水力冲土方法施工。水力冲土施工在本省大型水利土方工程中还是首次采用,加快了工程进度,节约了工程费用,省去动员大批民力,不增加后方负担,一举数得。土方工程概况淮阴复线船闸位于淮阴市西郊六公里处,在现有船闸北侧,纵向中心线相距160米,是京杭运扬段续建工程之一。
The total earthwork volume of the Huaiyin double-track ship lock project is 3.31 million cubic meters, of which, most of the earth-moving earthworks at the gate ponds and the upper and lower guideways are constructed by hydraulic caving method. Hydraulic earth-moving construction in the province for the first time large-scale water conservancy earthworks or the first time, speed up the progress of the project, saving construction costs, eliminating the need to mobilize a large number of people, without increasing the burden on the rear, in one fell swoop. Overview of earthworks Huaiyin double-track ship lock is located six kilometers west of Huaiyin City, north of the existing ship lock, the longitudinal center line 160 meters away, is the Beijing-Hangzhou Yunyang continued construction of one.