高层建筑各楼层剪力墙水平施工缝的处理方法为:待楼层混凝土浇筑48h后,混凝土强度达到1.5N/mm2、基本达到楼层混凝土上人条件时,由专业技术工人用锤钎将剪力墙钢筋之间的混凝土表面凿出,深度为2~3cm,使该部位形成凹凸的粗糙面,从而起到水平施工缝毛化处理的作用,然后将凿除的混凝土松散碎块清理干净。由于碎块在剪力墙墙筋之间部位,人工不易清理彻底,我单位通过实际操作,总结出用空气压缩机(即气泵)清理混凝土碎块法,清理效果较好。
High-rise building on all levels of shear wall horizontal construction joints treatment method is: to be the floor concrete pouring 48h, the concrete strength of 1.5N / mm2, basically reached the concrete condition of the floor conditions, by professional and technical workers hammer drill will shear wall The surface of the concrete between the steel bars is cut to a depth of 2 to 3 cm so that the rough surface of the part is formed to have a rough surface so as to achieve the effect of horizontal construction seaming and then the chipped loose concrete pieces are cleaned. As the pieces in the shear wall between the tendon wall, labor is not easy to clean thoroughly, my unit through the actual operation, concluded that the air compressor (ie, air pump) to clean concrete fragments, cleaning better.