论文部分内容阅读
本文从地质勘探,设计改革和施工组织三方面简要阐述加快煤矿建设降低工程选价的途径,以适应新形势对能源建设的需要.
This article briefly elaborates the ways of speeding up the construction of coal mines and reducing the project cost from three aspects of geological prospecting, design reform and construction organization so as to meet the need of energy construction in the new situation.