地下连续墙作为临时围护、地下室外墙、竖向承重的“三墙合一”结构,其应用越来越广,当其兼作承重结构时,主要承担单柱或裙房竖向荷载,单幅承载力设计值普遍较小。本文结合五矿金融大厦项目施工实例,介绍了TT型地下连续墙的设计、槽体加固、成槽工艺、垂直度控制、后注浆施工等关键技术,经过严格的施工控制,完全满足“三墙合一”功能,其成功经验对类似工程具有较高的参考价值。
The underground continuous wall as a temporary envelope, basement wall, vertical load-bearing “three walls together ” structure, its application is more and more widely, when its double as load-bearing structure, the main commitment to single column or skirt vertical load , Single bearing capacity design value is generally small. In this paper, with the construction of Minmetals Finance Building Project, the key technologies of TT continuous diaphragm wall design, tank body reinforcement, groove forming, verticality control and post-grouting construction are introduced. After rigorous construction control, Three walls together "function, the successful experience of similar projects with a higher reference value.