摘要:随着建筑业的不断发展,城市土地的日益紧缺,高层建筑越来越多,基坑也逐渐加深,边坡支护的安全施工对整项工程具有重要的意义和作用。积极做好边坡支护的安全施工工作,可以增强地基持力层的承载力,增强工程安全施工的系数,增强周边建(构)筑物的安全性和稳定性。缩短施工工期,降低工程处理费用,减少成本,获得更大经济效益等。下文就是介绍一下有关深基坑边坡支护及安全施工的措施。
关键词:边坡支护 ; 安全施工;有效措施
Pick to: with the continuous development of construction industry, the urban land increasingly scarce, more and more high-rise buildings, foundation pit also gradually deepening, the safety of the slope supporting construction has important significance and function of the whole project. Completes the slope support the safety of the construction work, can enhance the bearing capacity of foundation bearing layer, strengthen engineering construction safety coefficient, the enhancement of surrounding building, security and stability. Shorten the construction period, reduce the processing cost, reduce cost and obtain greater economic benefits, etc. Below is the introduction of the deep foundation pit slope support and safety construction measures.
Key words: the slope supporting; Safe construction; Effective measures
中圖分类号:TV551.4文献标识码:A文章编号:2095-2104(2013)
引 言
随着我国经济的不断发展,建筑业的不断发展,城市土地的紧缺,高层建筑越来越多,基坑也逐渐加深,而且施工现场场地狭小,在土方工程施工过程中,边坡支护的安全问题是保证工程顺利施工的重要问题。故选用安全、经济、合理的边坡支护方式和施工措施是很重要的,探讨边坡支护安全施工的措施具有重要的意义和作用。
1工程概况
本工程位于贵阳溶蚀盆地,属于溶蚀~侵蚀型山地斜坡地貌,位于贵阳市宝山北路照壁巷内,贵阳塑料七厂旧址,北靠贵州日报社,南面是即将打造的照壁山公园,基坑东西长约145m,南北长约105m。基坑开挖后,将在北、东、南侧形成16~23m基坑边坡为临时性边坡;前期开挖面积约为8200m2,基坑支护采用抗滑桩加锚索支护,本基坑的桩锚支护段重要性等级为一级。
2边坡治理措施方案
2.1 抗滑桩施工
本基坑工程采用支护桩+预应力锚索的支护形式,圆桩直径D=1200mm、D=1500mm、间距3500mm、桩顶设置500mm(高)×1200mm、600mm(高)×1500mm(宽)的冠梁,桩身和冠梁砼等级采用C30混凝土。桩身配筋:主筋为25Φ25(Ⅲ级钢)、箍筋Φ10@100(Ⅰ级钢)、 加强筋Φ18@2000(Ⅱ级钢)。孔桩采用人工挖孔。
2.2 钢筋混凝土冠梁施工流程
一整段的支护桩混凝土浇筑完毕→开挖土方到拟定标高→边坡喷锚→清理桩头(桩头凿毛和钢筋调直)→绑扎冠梁钢筋→支设冠梁模板→浇筑冠梁混凝土→养护混凝土→拆除模板。
2.3 预应力锚索施工流程
本工程在边坡面上分别采用六至七道预应力锚索对支护结构进行锚拉,以增强支护结构抗倾覆的能力。
2.3.1 锚孔钻造
钻孔直径φ110mm,锚孔倾角为20o,钻孔设备采用潜孔钻机,钻孔工艺采用偏心钻。由于坡面岩层破碎,在破碎岩层中采用套管跟进钻孔,钻过破碎岩层后,钻锚固段时,停止套管跟进。并根据岩性及完整性确认通过破碎层至稳定地层中,有足够的锚固长度后终孔(锚固段嵌入基岩长度不小于5m),最后用高压风或高压水洗孔。
2.3.2 锚索制作
选用直径15.24mm,强度1860MPa的高强度低松驰无粘结钢绞线,延伸率不小于3.5%。采用7φ15.24的钢绞线组装,锚固段钢绞线设计成菱形(枣核状)。自由段采用三道防护措施,即钢绞线上涂防锈漆,用PVC套管隔离,再用水泥砂浆裹护。
2.3.3 预应力锚索张拉
设计拉力:锚索设计张拉力700kN,每孔7φ15.24预应力钢绞线。锚索张拉力与锚固力:锚索采取分步张拉,每孔7根整体分步张拉,分5级按设计荷载700kN的25%、50%、75%、100%和110%进行施拉,每次持荷时间2min~5min,最后一级持荷稳定观测10min以后按设计要求锁定,锁定后48h内没有出现明显的应力松驰现象,即可进行封锚。
3施工安全措施
3.1 工程施工前的有效防控:
工程施工前得有效防护,需要做到以下几个方面:
3.1.1 委托具有相应资质的勘察单位对建筑场地进行勘察,详细了解建设场地的地形、地貌、土层种类、地下水位等特性,认真研究工程地质勘察报告,根据开挖尺寸范围内不同土层的物理特征和地下水位情况,采取相应降、排水措施。
3.1.2 调查分析基坑周围建(构)筑物分布情况,特别是邻近建(构)筑物上部结构、基础结构形式及埋深对沉降差异的敏感程度等,测量其与基坑边线尺寸距离和相对高差。如果基坑深于原有建筑物基础时,还要考虑原有建筑物基础的压力扩散影响,采取保护原有建筑物的措施。
3.1.3 调查基坑周边的地下设施、地下管线、地下古墓文物情况,特别是城市给排水管网、热力煤气管、电缆、通讯光缆线路及重要大型地下设施,不仅要查清位置、走向、数量、结构形式及埋深等情况,而且要与有关部门协商制订保护措施。
3.1.4 调查、分析当地材料供应、土方运输机械、排水设备拥有及其他协作条件等资源供应的情况;了解场地周边的环境和当地施工期间的气候等条件,为施工准备提供依据。
3.1.5 熟悉设计图纸,认真核查建(构)筑物基础的位置、布置走向、结构及深度的数据准确性。并结合不同土层的物理性能、地下水位情况及周围环境的特点,编制一套有针对性的基坑开挖施工方案,确保基坑开挖位置准确和周边建(构)筑物、地下设施管线的安全。如果遇到深基坑,建设单位应委托有资质的设计单位进行专项深基坑支护设计,或施工单位编制的专项施工方案提请专家评委会审核同意后方可实施。
3.2 工程施工过程中控制
工程施工过程中,需要采取相应的控制措施,保障工程的顺利按期安全完工。
3.2.1 必须按批准的开挖顺序和分层高度进行开挖,放坡也应按不同土质放出不同的坡度,必要时要进行边坡防护,并加强对毗邻建筑物的沉降观测点、设施标志的测设。对基坑开挖至回填前,暴露期较长的基坑,易遭风雨、日晒、顶动荷载和降水的影响而产生变形,必须严密监视。
3.2.2 对软土地区或地下水位较高的地区,要遵循方案及时做好地面排水和地下降水工作。地下降水要注意邻近建筑物及设施的沉降,必要时要及时做好截水帷幕和降水回灌的工作。在粘性土层中施工时,必须按方案及时支顶防护,严禁掏挖。相邻基坑同时施工应先深后浅,不可心存侥幸,盲目乱来。在膨胀土地区基坑开挖要避免雨期施工和防止基坑底部遭受雨水浸泡和日光曝晒。
3.2.3 基坑挖土施工不得在坑顶任意堆土、停车、挖沟或架设有振动作用的机械。坑顶应设截水设施,防止地表水流入基坑冲刷坡面。坡面如果过大,宜分段并在坡脚增设排水沟和集水井,及时抽排地面降水,减少水土流失。
3.2.4 基坑设计有护坡桩时,要保证护坡桩桩身质量及桩距、桩长、桩径,预制桩打人要保证沉桩深度,两排桩以上时要保证桩排距和相对关系,需要拉锚时要保证锚碇稳固、锚索强度、接头可靠,板桩要接缝正确、严密。
3.2.5 基坑挖土接近基底标高时,应严密监视和有效控制,防止超挖。如采用机械挖土或在冬期、雨期施工,宜预留20cm厚度不挖,在通知有关验槽人员临场前由人工挖除,同时进行修边,挖排水沟、集水井,组织基础施工期基坑排水。
3.3 施工时密切注意坍塌先兆,及时采取有效防范措施
3.3.1 基坑开挖中如发现坑壁塌方先兆、意外填土、管涌、邻近建筑物地基基础裸露等情况,应立即中止开挖,并报告有关人员临场处置,绝不可心存侥幸,继续施工。因为有可能地质报告不细或土层变化预测失准,措施不当,数据有误,需要变更方案,防止意外事故。
3.3.2 基坑开挖中如发生护坡桩顶位移,桩身倾斜,应立即停止挖土,并采取锚拉或支护等措施。如桩身已经折断,应设法拔出或加桩防护,只有在护坡桩中止变形后才能继续施工。
3.3.3 进行混凝土支护结构施工时,应注意留取同条件养护试件,以便在强度达到要求时及时连续施工。但一定要保证混凝土的养护龄期,保证挡墙等支护结构的入土深度,保证锚(杆)索的长度,保证锚拉的可靠。分层支护要注意及时性、整体性;模板拆除要尽量减小振动,要遵循按层次和顺序施工。
4结束语
综上所述,边坡支护的安全施工对整项工程具有重要的意义和作用,做好边坡支护的安全施工工作显得尤为重要。因此,需要采取积极有效的施工措施,才能保证整项工程的顺利开展和完成。积极做好边坡支护的安全施工工作,可以增强地基持力层的承载力,增强工程安全施工的系数,增强周边建(构)筑物的安全性和稳定性。缩短施工工期,降低工程处理费用,减少成本,获得更大经济效益等。安全就是效益,质量就是生命。保障安全施工,切实提高工程质量,对增强企业的经济实力和市场竞争力,具有重要的意义和作用。
参考文献
[1]冯勇.建筑混凝土的施工技术研究[J].建材世界.2011:11-13
[2]鄭生庆.《建筑边坡工程技术规范》.岩土工程界[J] 2003
[3]佴磊.边坡工程. 2010-09-01
收稿日期:2013-7
作者介绍:王炳文(1976-),男,贵州省大方县人,大专,土建工程师,二级建造师,主要从事建筑施工技术和经营管理工作。
关键词:边坡支护 ; 安全施工;有效措施
Pick to: with the continuous development of construction industry, the urban land increasingly scarce, more and more high-rise buildings, foundation pit also gradually deepening, the safety of the slope supporting construction has important significance and function of the whole project. Completes the slope support the safety of the construction work, can enhance the bearing capacity of foundation bearing layer, strengthen engineering construction safety coefficient, the enhancement of surrounding building, security and stability. Shorten the construction period, reduce the processing cost, reduce cost and obtain greater economic benefits, etc. Below is the introduction of the deep foundation pit slope support and safety construction measures.
Key words: the slope supporting; Safe construction; Effective measures
中圖分类号:TV551.4文献标识码:A文章编号:2095-2104(2013)
引 言
随着我国经济的不断发展,建筑业的不断发展,城市土地的紧缺,高层建筑越来越多,基坑也逐渐加深,而且施工现场场地狭小,在土方工程施工过程中,边坡支护的安全问题是保证工程顺利施工的重要问题。故选用安全、经济、合理的边坡支护方式和施工措施是很重要的,探讨边坡支护安全施工的措施具有重要的意义和作用。
1工程概况
本工程位于贵阳溶蚀盆地,属于溶蚀~侵蚀型山地斜坡地貌,位于贵阳市宝山北路照壁巷内,贵阳塑料七厂旧址,北靠贵州日报社,南面是即将打造的照壁山公园,基坑东西长约145m,南北长约105m。基坑开挖后,将在北、东、南侧形成16~23m基坑边坡为临时性边坡;前期开挖面积约为8200m2,基坑支护采用抗滑桩加锚索支护,本基坑的桩锚支护段重要性等级为一级。
2边坡治理措施方案
2.1 抗滑桩施工
本基坑工程采用支护桩+预应力锚索的支护形式,圆桩直径D=1200mm、D=1500mm、间距3500mm、桩顶设置500mm(高)×1200mm、600mm(高)×1500mm(宽)的冠梁,桩身和冠梁砼等级采用C30混凝土。桩身配筋:主筋为25Φ25(Ⅲ级钢)、箍筋Φ10@100(Ⅰ级钢)、 加强筋Φ18@2000(Ⅱ级钢)。孔桩采用人工挖孔。
2.2 钢筋混凝土冠梁施工流程
一整段的支护桩混凝土浇筑完毕→开挖土方到拟定标高→边坡喷锚→清理桩头(桩头凿毛和钢筋调直)→绑扎冠梁钢筋→支设冠梁模板→浇筑冠梁混凝土→养护混凝土→拆除模板。
2.3 预应力锚索施工流程
本工程在边坡面上分别采用六至七道预应力锚索对支护结构进行锚拉,以增强支护结构抗倾覆的能力。
2.3.1 锚孔钻造
钻孔直径φ110mm,锚孔倾角为20o,钻孔设备采用潜孔钻机,钻孔工艺采用偏心钻。由于坡面岩层破碎,在破碎岩层中采用套管跟进钻孔,钻过破碎岩层后,钻锚固段时,停止套管跟进。并根据岩性及完整性确认通过破碎层至稳定地层中,有足够的锚固长度后终孔(锚固段嵌入基岩长度不小于5m),最后用高压风或高压水洗孔。
2.3.2 锚索制作
选用直径15.24mm,强度1860MPa的高强度低松驰无粘结钢绞线,延伸率不小于3.5%。采用7φ15.24的钢绞线组装,锚固段钢绞线设计成菱形(枣核状)。自由段采用三道防护措施,即钢绞线上涂防锈漆,用PVC套管隔离,再用水泥砂浆裹护。
2.3.3 预应力锚索张拉
设计拉力:锚索设计张拉力700kN,每孔7φ15.24预应力钢绞线。锚索张拉力与锚固力:锚索采取分步张拉,每孔7根整体分步张拉,分5级按设计荷载700kN的25%、50%、75%、100%和110%进行施拉,每次持荷时间2min~5min,最后一级持荷稳定观测10min以后按设计要求锁定,锁定后48h内没有出现明显的应力松驰现象,即可进行封锚。
3施工安全措施
3.1 工程施工前的有效防控:
工程施工前得有效防护,需要做到以下几个方面:
3.1.1 委托具有相应资质的勘察单位对建筑场地进行勘察,详细了解建设场地的地形、地貌、土层种类、地下水位等特性,认真研究工程地质勘察报告,根据开挖尺寸范围内不同土层的物理特征和地下水位情况,采取相应降、排水措施。
3.1.2 调查分析基坑周围建(构)筑物分布情况,特别是邻近建(构)筑物上部结构、基础结构形式及埋深对沉降差异的敏感程度等,测量其与基坑边线尺寸距离和相对高差。如果基坑深于原有建筑物基础时,还要考虑原有建筑物基础的压力扩散影响,采取保护原有建筑物的措施。
3.1.3 调查基坑周边的地下设施、地下管线、地下古墓文物情况,特别是城市给排水管网、热力煤气管、电缆、通讯光缆线路及重要大型地下设施,不仅要查清位置、走向、数量、结构形式及埋深等情况,而且要与有关部门协商制订保护措施。
3.1.4 调查、分析当地材料供应、土方运输机械、排水设备拥有及其他协作条件等资源供应的情况;了解场地周边的环境和当地施工期间的气候等条件,为施工准备提供依据。
3.1.5 熟悉设计图纸,认真核查建(构)筑物基础的位置、布置走向、结构及深度的数据准确性。并结合不同土层的物理性能、地下水位情况及周围环境的特点,编制一套有针对性的基坑开挖施工方案,确保基坑开挖位置准确和周边建(构)筑物、地下设施管线的安全。如果遇到深基坑,建设单位应委托有资质的设计单位进行专项深基坑支护设计,或施工单位编制的专项施工方案提请专家评委会审核同意后方可实施。
3.2 工程施工过程中控制
工程施工过程中,需要采取相应的控制措施,保障工程的顺利按期安全完工。
3.2.1 必须按批准的开挖顺序和分层高度进行开挖,放坡也应按不同土质放出不同的坡度,必要时要进行边坡防护,并加强对毗邻建筑物的沉降观测点、设施标志的测设。对基坑开挖至回填前,暴露期较长的基坑,易遭风雨、日晒、顶动荷载和降水的影响而产生变形,必须严密监视。
3.2.2 对软土地区或地下水位较高的地区,要遵循方案及时做好地面排水和地下降水工作。地下降水要注意邻近建筑物及设施的沉降,必要时要及时做好截水帷幕和降水回灌的工作。在粘性土层中施工时,必须按方案及时支顶防护,严禁掏挖。相邻基坑同时施工应先深后浅,不可心存侥幸,盲目乱来。在膨胀土地区基坑开挖要避免雨期施工和防止基坑底部遭受雨水浸泡和日光曝晒。
3.2.3 基坑挖土施工不得在坑顶任意堆土、停车、挖沟或架设有振动作用的机械。坑顶应设截水设施,防止地表水流入基坑冲刷坡面。坡面如果过大,宜分段并在坡脚增设排水沟和集水井,及时抽排地面降水,减少水土流失。
3.2.4 基坑设计有护坡桩时,要保证护坡桩桩身质量及桩距、桩长、桩径,预制桩打人要保证沉桩深度,两排桩以上时要保证桩排距和相对关系,需要拉锚时要保证锚碇稳固、锚索强度、接头可靠,板桩要接缝正确、严密。
3.2.5 基坑挖土接近基底标高时,应严密监视和有效控制,防止超挖。如采用机械挖土或在冬期、雨期施工,宜预留20cm厚度不挖,在通知有关验槽人员临场前由人工挖除,同时进行修边,挖排水沟、集水井,组织基础施工期基坑排水。
3.3 施工时密切注意坍塌先兆,及时采取有效防范措施
3.3.1 基坑开挖中如发现坑壁塌方先兆、意外填土、管涌、邻近建筑物地基基础裸露等情况,应立即中止开挖,并报告有关人员临场处置,绝不可心存侥幸,继续施工。因为有可能地质报告不细或土层变化预测失准,措施不当,数据有误,需要变更方案,防止意外事故。
3.3.2 基坑开挖中如发生护坡桩顶位移,桩身倾斜,应立即停止挖土,并采取锚拉或支护等措施。如桩身已经折断,应设法拔出或加桩防护,只有在护坡桩中止变形后才能继续施工。
3.3.3 进行混凝土支护结构施工时,应注意留取同条件养护试件,以便在强度达到要求时及时连续施工。但一定要保证混凝土的养护龄期,保证挡墙等支护结构的入土深度,保证锚(杆)索的长度,保证锚拉的可靠。分层支护要注意及时性、整体性;模板拆除要尽量减小振动,要遵循按层次和顺序施工。
4结束语
综上所述,边坡支护的安全施工对整项工程具有重要的意义和作用,做好边坡支护的安全施工工作显得尤为重要。因此,需要采取积极有效的施工措施,才能保证整项工程的顺利开展和完成。积极做好边坡支护的安全施工工作,可以增强地基持力层的承载力,增强工程安全施工的系数,增强周边建(构)筑物的安全性和稳定性。缩短施工工期,降低工程处理费用,减少成本,获得更大经济效益等。安全就是效益,质量就是生命。保障安全施工,切实提高工程质量,对增强企业的经济实力和市场竞争力,具有重要的意义和作用。