施工地段地质情况复杂,路面下土壤中砖瓦、石头较多,震动钻进很困难。底层中砂较密实,含土量小,钻进后回淤很快“抱管”故障时有发生。根据这些特殊情况,采用了新设计的射水钻头和投球器,在射流不间断的情况下改变射束的喷射方向,克服了以上困难,施工得以顺利进行。其施工顺序、工艺及工艺分析如下: (1)根据设计放线确定旋喷桩位,按施工方案布置好施工机具的相互位置,如图
The geological conditions in the construction site are complex. There are more bricks and stones in the soil under the road surface, and vibration drilling is very difficult. The sand in the bottom layer is denser, with a small amount of soil, and the back-silting soon after the drilling has occurred. According to these special circumstances, the newly designed jet ram and the pitcher were used to change the jet direction of the jet under the condition of uninterrupted jet flow, which overcomes the above difficulties and allows the construction to proceed smoothly. The construction sequence, technology and process analysis are as follows: (1) According to the design of the line to determine the rotary spray pile position, according to the construction program to arrange the mutual position of the construction machinery, as shown