三明钢铁厂三座高炉(共944m~3),三座15t顶吹转炉,七条轧钢生产线,轧钢生产能力大于炼钢,炼钢能力大于炼铁,在这样装备条件下,不增加投资建高炉或者高炉扩容改造,怎么样挖潜上规模效益?三钢选择高炉加小铁厂生铁块(本厂的渣钢),转炉多加废钢、生铁办法,本省有两个有铁无钢企业,生铁块好买,运输方便。1997年1~10月份高炉加铁(包括本厂的渣钢)121.14kg/t铁,转炉加铁、废钢186kg/t钢。1997年1~10月份生产铁650608t,同比增长21.64%,钢690232t,同比增长27.56%,钢材685104t,同比增长45.01%,铁钢比0.943,钢比铁多39624t。多数职工对总厂这个选择认为是正确的,但是,也有少数职工有异议“认为高炉加铁块会增加铁的成本(外购铁到厂平均价1099.81元,包括运费与加工费);高炉加铁喷煤量会减少;高炉加铁对炉顶设备磨损严重;加铁炉温不好控制,影响高炉操作等。1号高炉(350m~3)没有加铁,3号高炉(300m~3)加铁,两座高炉指标比较如表1所示。
Sanming Iron and Steel Plant three blast furnace (944m ~ 3), three 15t top blowing converter, seven rolling production lines, rolling capacity greater than steelmaking, steelmaking capacity is greater than ironmaking, in such equipment, without increasing investment in building a blast furnace or Blast furnace expansion transformation, how to tap the scale of efficiency? Three steel choose blast furnace plus small iron mill pig iron (factory slag), converter plus more scrap, pig iron approach, the province has two iron and steel-free enterprises, a good buy of pig iron Easy to transport. From January to October 1997, 121.14kg / t iron was added into the blast furnace and iron (including the slag steel of the factory), and the iron and steel of the converter plus 186kg / t steel were scrapped. From January to October 1997, the production of iron was 650608t, an increase of 21.64% over the same period of last year. The steel output was 690232t, an increase of 27.56% over the same period of last year. The total amount of steel products was 685104t, up by 45.01% over the same period of the previous year. The ratio of iron and steel was 0.943 and that of steel was 39624t. Most workers think this option is correct, but there are also a few workers who disagree. ”They think that adding blast furnace and iron will increase the cost of iron (the average price of purchased iron to the factory is 1099.81 yuan, including freight and processing fees); blast furnace The amount of coal injected into the iron will be reduced; blast furnace plus iron to wear on the top of the furnace equipment is serious; plus iron temperature is not good control, affecting blast furnace operation, etc. No blast furnace (350m ~ 3) without iron, blast furnace No. 3 ) Plus iron, two indicators of the blast furnace as shown in Table 1 below.