论文部分内容阅读
在充分调查的基础上,将阜阳北站出发场11-14道不能进行预检的原因归结为列检设备设置使股道实际有效长减小、使用移动脱轨器程序繁杂两个原因,提出了将风管和固定脱轨器南移的设备改造方案。
On the basis of adequate investigation, the reasons why 11-14 Road Fuyang North Station departure can not be pre-cleared can be attributed to the two reasons that the inspection equipment is set to reduce the actual effective length of the stock and the procedure of using the mobile derailer is complicated. Equipment to transform the wind pipe and fixed derailer to the south.