论文部分内容阅读
本文通过对某地方铁路运煤专用线简支T梁制存梁场规划设计、T梁预制的设计总结分析,指出简支T梁制架是影响项目建设总工期的重要控制因素,同时对各环节设计提出个人的看法。
In this paper, the planning and design of the simply supported T beam storage girder field and the design of the T beam prefabricated by a local railway coal transportation line are summarized. It is pointed out that the simple T beam system is an important control factor that affects the total construction duration of the project. At the same time, Make a personal opinion