大占头拦河闸设计过闸流量>5000 m~3/s,工程等别为大(1)型。拦河闸底部高程131.50 m,闸基(1)层中粗砂层和(3)层砂卵石层为强透水层,拦河闸建成挡水后存在闸基渗漏和渗透稳定问题,建议对闸基采取防渗处理措施。由于高压旋喷灌浆成墙技术具有良好的变形协调性能以及抗渗性能,采用高喷防渗墙对闸基进行处理。处理后经检测各指标满足设计要求,证明该拦河闸地基处理方案是合理可行的。
Da Zhaitou head gate design of the gate flow rate of> 5000 m ~ 3 / s, the project is not so large (1) type. The bottom elevation of the sluice gate is 131.50 m. The coarse sand layer and (3) sand and gravel layer in the base layer (1) of the sluice gate are strong permeable layers. After the sluice gates are built, there is a problem of sluice base seepage and seepage stability. Gate base to take anti-seepage treatment measures. As a result of high-pressure jet grouting wall technology has good deformation coordination and impermeability, using high-jet cut-off wall of the gate base for processing. After treatment, the tested indexes meet the design requirements, which proves that the foundation treatment scheme of the barrage is reasonable and feasible.