论文部分内容阅读
近日,Delte完成了营口万达广场建设中的冷热源系统、空调通风系统、送排风系统、给排水系统等5 000个输入输出点的控制和集成。共设立了4个工作站,20条子网,共配置了83台DAC-1146、11台DAC-1180、14台DAC-1600、56台DAC-304、20台DAC-633、29台DAC-606。营口万达广场规划总建筑面积约71.71万m2,总投资约60亿元,分为大商业、写字楼、公寓等几个部分。营口万达广场是以国际化大型购物中心为核心,集零售、餐饮、娱乐、办公、酒店、
Recently, Delte completed the construction and control of Yingkou Wanda Plaza, cold and heat source system, air conditioning and ventilation systems, air supply and drainage systems, water supply and drainage system 5000 input and output points of control and integration. A total of four workstations and 20 sub-networks were set up, with 83 DAC-1146, 11 DAC-1180, 14 DAC-1600, 56 DAC-304, 20 DAC-633 and 29 DAC-606. Yingkou Wanda Plaza planning a total construction area of about 717,100 m2, a total investment of about 6 billion yuan, divided into large commercial, office buildings, apartments and several other parts. Yingkou Wanda Plaza is an international shopping mall as the core, set retail, catering, entertainment, office, hotel,