目前我国铁路线路上还存在着许多铁路与公路交叉的平交道口,这些平交道口成为高速安全行车的一大障碍。敬爱的周总理生前曾对此作过重要指示,铁道部在“五、五”规划中,也要求在几年内解决这一问题。但在已成线路上设置立交桥,不得不采用顶进方法,这种桥的特点是:用钢量大,计算繁琐。在进行一座桥的设计时,四个人用了四个月时间,每平方米用钢量为410公斤。在设计进度上和材料消耗上,都存在着很大的问题。铁道部第三设计院标准处和北京局要我们参加这一设计。按专业说,我们是搞隧道
At present, there are still many crossing intersections between railways and roads in our country’s railway lines, which have become a major obstacle to the high-speed and safe driving. Dear Premier Zhou Enlai had made important instructions during his lifetime, the Ministry of Railways in the “five, five” plan, also called for a few years to solve this problem. However, overpass has been set into the line, had to use the jacking method, this bridge is characterized by: a large amount of steel, computational complexity. During the design of a bridge, four people spent four months, 410 kg of steel per square meter. In the design progress and material consumption, there is a big problem. Ministry of Railways Third Design Institute Standards Office and the Beijing Bureau wants us to participate in this design. By profession, we are engaged in tunnels