论文部分内容阅读
1978年,美国客运公司在纽约Albany Rensselaer车站以北,建成了一座厂房面积12,263米~2的燃气轮动车组检修基地。该基地在厂房设计建造上的一个重要特点是,在通风系统中采用了热交换装置充分回收利用热能。因此,两年来在节约能源方面取得了显著的成效。这个基地的厂房是为每天检修7列燃气轮动车组以及电传动内燃机车的日常维修和定期修理而设计的。为了及时排除厂房内的烟尘,保持空气清洁,设计每小时要通六次风,这需要
In 1978, the US Passenger Transport Company built a 12,263-m 2 gas-fired EMU overhaul facility north of Albany Rensselaer station in New York. The base in the plant design and construction of an important feature is the use of ventilation systems in the heat exchange device to fully recover heat. Therefore, remarkable achievements have been made in energy conservation over the past two years. The site’s plant is designed to routinely repair and periodically repair seven gas-fired EMUs and electric drive diesel locomotives. In order to promptly rule out the smoke inside the plant, keep the air clean, designed to pass the wind six times an hour, which requires