论文部分内容阅读
摘要: 树木移植在城镇的园林绿化中具有重要的作用,但是大树移植在园林绿化中是难度最大,工期最长的一项栽植工程,因此研究大树移植的技术,使大树移植的成活率以及移栽质量得到提高也显得尤为重要,本文主要从大树移栽的基本原理、移栽前的准备工作、移栽中的具体措施以及移栽后的养护以及管理等进行探讨,从而能够最大限度提高大树的移栽质量和成活率。
关键词: 园林绿化;大树移栽;养护管理
Abstract: the trees in the urban landscape transplant plays an important role, but the tree in the garden green is in transplant most difficult, the longest period of a plant engineering, so the big tree transplanted technology, and to make the tree transplant survival rate and transplanting quality improved also appears especially important, this article mainly from the tree transplanting, the basic principle of transplanting the preparing work before, the specific measures and transplanting the transplant of maintenance and management after were discussed, which can maximize the tree of transplanting quality and survival rate.
Keywords: landscape; The tree planted; Maintenance management
中圖分类号: S73文献标识码:A 文章编号:
引言:随着城市化建设的不断加快,东台市委、市政府围绕建设“生态东台”的目标,采取各种行之有效的措施,不断加大绿化行业管理执法力度,努力提高绿化工程建设和养护管理水平,改善人们的生活环境。在园林绿化的过程中,大树移栽可以在很短的时间内提高城市的生态效益,优化绿地结构,从而改善城市环境和景观。因此,进行研究探讨大树移植技术以及移植后的养护管理可以充分发挥大树的优势,促进“生态东台”园林城市的建设。
大树移植前的准备工作
大树移植一般是指胸径15cm以上的常绿乔木和胸径20cm以上的落叶乔木,在大树移植时,还应该根据移栽树种、季节、年龄、地点以及移栽距离等等因素不同,移栽大树的难以程度也就不同,所以在进行移栽前应该先进行确定移栽的方案和移栽技术。
季节的选择
在园林绿化进行移栽大树时,应该在树木休眠时期进行移栽,这个时期大树的生理作用还没有开始,大树对维持生命所需要的养分、水分以及光照等要求都非常低,所以在这个时期进行移植成活率比较高,大树休眠时期一般在春季芽萌动之前和秋季树木落叶之后,在树木停止生长的时期进行移栽。
树种的选择
在进行选择树木时,应该根据园林绿化工程的要求,并且应该坚持适地适树的原则进行确定树种以及规格。在选择树种时,应该选用生长健壮的乡土树种并应该遵循“生境相似性原理”,从水、光、热、气等气候条件和土壤条件以及周边的环境等进行综合考虑。选择树种的规格一般包括树木的规格包括胸径、树高、冠幅、树形、树相、树势等。树种不同移栽难易不同。一般比较容易成活的树木主要有柳、五针松、杨、臭椿、梧桐、罗汉松、槐、枫树、合欢等,一般成活率不高的树木有云杉、柏类、华山松、白桦、泡桐、落叶松等,并且野生的树种成活率比较高,树龄越大越不易成活[1],在进行移栽前,通过进行实地考察和成本分析,确定树种来源并落实到位。同时在选定的树木上用铅油在朝阳(南)方向的胸径处做好标记和编号,一树一卡。挂牌登记,分类管理。同时做好移栽前各项准备工作,如办理准运证和检疫证等。
大树移栽技术
(1)修剪
在大树移植的过程中,应该做好修剪工作,修剪的目的主要是为了保持树木地下、地上两部分的水分代谢平衡。修剪强度根据具体情况而定,树冠愈大、根部愈裸、伤根愈多、生根愈难、季节愈反,愈应加大修剪强度,尽可能减小树冠的蒸腾面积。落叶乔木的修剪,一般保留全冠的1/2~2/3,其余全部剪掉;生长速度快、树冠易恢复的大树可进行重剪,剪掉全部树冠[3];常绿乔木适当进行修剪即可。一般去除枯死枝、过密枝和干裙枝,尽量保持树冠完整。在修剪之后,应该注意剪口的处理,剪口的处理方法有很多种,比如常见的处理方法有凡士林、塑料薄膜以及植物专用伤口涂抹剂等。
起挖
在进行挖树时期,为防止运输和移栽过程中出现树木失水过多和散球现象,要求挖掘前一定要对树体及其周围灌足水分,保证大树的根部、枝干和叶片都储存足够的水分,同时也利于挖掘。挖树范围应大于树木胸径的10倍。土球直径一般应是树木地径的6—8倍,依树形而定,圆柱形可小,圆锥形宜大,土球要用草绳包扎,从而可以有效保证根部土球不易松散,做好保护大树根部的工作。在进行挖树的过程中,一般采用人工挖掘软材包装移栽法和木箱包装移栽法,在选择移栽的方法时,应该根据具体的树种选择具体的移栽方法,从而保证移栽的树木的成活率。在起树前,应该把干基周围2~3 m以内的碎石、灌木丛等清除干净[4]。对大树还应准备3根支柱进行支撑,以防倒伏后造成工伤事故和损坏树木。
大树定值
在大树运到之后,必须尽快定值,按树种分别将大树轻轻斜吊于定植穴内 撤除缠扎树冠的绳子 将树冠立起扶正 移动和调整树冠方位 尽量符合原来的朝向 并保证定植深度适宜。最后把根部土球外包扎的箱板或者绳索去除,并进行分层夯实,把土球埋在地下,并做好拦水树盘满足透水,从而保证移栽大树的成活率。
三、大树移栽后的养护以及管理
(1)设立支撑:大树移栽后。必须及时进行树体固定,以防地面土层湿软,被大风吹刮而晃动,还有利于固定根系,促进根系生长。在进行设立支撑时,一般采用一般采用三柱支架正三角形支撑固定法,确保大树稳固,支撑点以树体高2/3处左右为宜。等到大树稳定之后,去除支撑。
(2)遮荫:遮荫材料最好选择遮荫度为70%的遮阳网,既避免了日光灼伤和水分过度散失,也保证了树体光合作用的进行。
(3)浇水:在大树移栽之后,应该立即进行浇水,从而保证水分的充足,并且可以使土壤和树根紧密相接,促进大树的根部生长。在移栽后应该根据情况进行浇水一般在5天到7天左右浇水一次,并应该连续浇水3——5次,在进行浇水的过程中应该遵循“不干不浇,浇则浇透”的原则进行浇水,从而保证大树水分的充足性。
(4)施肥喷药
在大树移栽之后,大树的根部会有损伤,因此根系吸收肥料的能力就会有所降低,这时可以采用一些速效肥料,比如硫酸铵、磷酸二氢钾、尿素等液肥进行施肥。在移栽之后也可以进行追肥,一般追施方法是叶面喷洒,追肥的时间为阴天或者早晚,遇降雨天气时要再喷1次。一般15 d左右追施1次。肥料浓度一般为0.2%一0.5%,如施尿素每株用量为0.1~025 kg,当年施肥1~2次,9月初停止施肥[4]。
大树在移栽之后,因修剪或者起苗等会对大树造成损伤,并且新长出的内叶或者幼芽抵抗能力比较低,所以大树很容感染病虫害,因此应该注意对大树的喷药,在喷药的过程中,可以采用托布津、多菌灵或者敌杀死等农药进行混和喷施,每周喷药1次,并且喷药时期一般在4月、7月、9月3个阶段。并且还应该根据树种特性和病虫害发生发展规律,勤检查,从而可以达到防治大树病虫害目的。
防寒防冻
在大树移栽之后,大树的生长会比较缓慢,而且大树的根系萌发比较迟,养分积累的比较少,组织不够充实,所以刚移栽的大树很容易受到低温或者空气变化的危害,因此应该做好大树的防寒防冻工作。在进行预防的过程中,可以在入秋后进行控制氮肥、增施磷肥、钾肥,从而提高树体的木质化程度 提高自身抗旱能力。然后在寒潮来临前,做好树木的保温工作,可以采取地面覆盖土壤或者是设立风障,塑料大棚等加强树木的保护,
在大树移栽之后,还应该做好宣传教育工作,在人流比较集中或其他易受人为或者禽畜等破坏的区域,并要做好宣传以及教育工作,同时,还可以进行设置竹篱等加以保护,从而保证大树移栽的成活率,促进园林绿化的建设。
参考文献:
[1]杨士雄;张晓军;刘志青:《大树移栽养护技术》现代农业科技;2011(7):
[2]郑翔;郑瑞杰;高荣海:《园林绿化中的大树移栽及养护管理技术》农业科技与装备;2010(4):254
[3]俞青娟;马庆红:《园林绿化中大树的移栽与养护技术》甘肃科技;2006,22(9):224
[4]蒋荣华;黄彩明:《大树移栽及养护技术探析》安徽农业科学;2008,36(28):12268--12269
作者简介:
夏晓明 男 1965.5 东台人 现职称:助理工程师 研究方向:园林绿化
关键词: 园林绿化;大树移栽;养护管理
Abstract: the trees in the urban landscape transplant plays an important role, but the tree in the garden green is in transplant most difficult, the longest period of a plant engineering, so the big tree transplanted technology, and to make the tree transplant survival rate and transplanting quality improved also appears especially important, this article mainly from the tree transplanting, the basic principle of transplanting the preparing work before, the specific measures and transplanting the transplant of maintenance and management after were discussed, which can maximize the tree of transplanting quality and survival rate.
Keywords: landscape; The tree planted; Maintenance management
中圖分类号: S73文献标识码:A 文章编号:
引言:随着城市化建设的不断加快,东台市委、市政府围绕建设“生态东台”的目标,采取各种行之有效的措施,不断加大绿化行业管理执法力度,努力提高绿化工程建设和养护管理水平,改善人们的生活环境。在园林绿化的过程中,大树移栽可以在很短的时间内提高城市的生态效益,优化绿地结构,从而改善城市环境和景观。因此,进行研究探讨大树移植技术以及移植后的养护管理可以充分发挥大树的优势,促进“生态东台”园林城市的建设。
大树移植前的准备工作
大树移植一般是指胸径15cm以上的常绿乔木和胸径20cm以上的落叶乔木,在大树移植时,还应该根据移栽树种、季节、年龄、地点以及移栽距离等等因素不同,移栽大树的难以程度也就不同,所以在进行移栽前应该先进行确定移栽的方案和移栽技术。
季节的选择
在园林绿化进行移栽大树时,应该在树木休眠时期进行移栽,这个时期大树的生理作用还没有开始,大树对维持生命所需要的养分、水分以及光照等要求都非常低,所以在这个时期进行移植成活率比较高,大树休眠时期一般在春季芽萌动之前和秋季树木落叶之后,在树木停止生长的时期进行移栽。
树种的选择
在进行选择树木时,应该根据园林绿化工程的要求,并且应该坚持适地适树的原则进行确定树种以及规格。在选择树种时,应该选用生长健壮的乡土树种并应该遵循“生境相似性原理”,从水、光、热、气等气候条件和土壤条件以及周边的环境等进行综合考虑。选择树种的规格一般包括树木的规格包括胸径、树高、冠幅、树形、树相、树势等。树种不同移栽难易不同。一般比较容易成活的树木主要有柳、五针松、杨、臭椿、梧桐、罗汉松、槐、枫树、合欢等,一般成活率不高的树木有云杉、柏类、华山松、白桦、泡桐、落叶松等,并且野生的树种成活率比较高,树龄越大越不易成活[1],在进行移栽前,通过进行实地考察和成本分析,确定树种来源并落实到位。同时在选定的树木上用铅油在朝阳(南)方向的胸径处做好标记和编号,一树一卡。挂牌登记,分类管理。同时做好移栽前各项准备工作,如办理准运证和检疫证等。
大树移栽技术
(1)修剪
在大树移植的过程中,应该做好修剪工作,修剪的目的主要是为了保持树木地下、地上两部分的水分代谢平衡。修剪强度根据具体情况而定,树冠愈大、根部愈裸、伤根愈多、生根愈难、季节愈反,愈应加大修剪强度,尽可能减小树冠的蒸腾面积。落叶乔木的修剪,一般保留全冠的1/2~2/3,其余全部剪掉;生长速度快、树冠易恢复的大树可进行重剪,剪掉全部树冠[3];常绿乔木适当进行修剪即可。一般去除枯死枝、过密枝和干裙枝,尽量保持树冠完整。在修剪之后,应该注意剪口的处理,剪口的处理方法有很多种,比如常见的处理方法有凡士林、塑料薄膜以及植物专用伤口涂抹剂等。
起挖
在进行挖树时期,为防止运输和移栽过程中出现树木失水过多和散球现象,要求挖掘前一定要对树体及其周围灌足水分,保证大树的根部、枝干和叶片都储存足够的水分,同时也利于挖掘。挖树范围应大于树木胸径的10倍。土球直径一般应是树木地径的6—8倍,依树形而定,圆柱形可小,圆锥形宜大,土球要用草绳包扎,从而可以有效保证根部土球不易松散,做好保护大树根部的工作。在进行挖树的过程中,一般采用人工挖掘软材包装移栽法和木箱包装移栽法,在选择移栽的方法时,应该根据具体的树种选择具体的移栽方法,从而保证移栽的树木的成活率。在起树前,应该把干基周围2~3 m以内的碎石、灌木丛等清除干净[4]。对大树还应准备3根支柱进行支撑,以防倒伏后造成工伤事故和损坏树木。
大树定值
在大树运到之后,必须尽快定值,按树种分别将大树轻轻斜吊于定植穴内 撤除缠扎树冠的绳子 将树冠立起扶正 移动和调整树冠方位 尽量符合原来的朝向 并保证定植深度适宜。最后把根部土球外包扎的箱板或者绳索去除,并进行分层夯实,把土球埋在地下,并做好拦水树盘满足透水,从而保证移栽大树的成活率。
三、大树移栽后的养护以及管理
(1)设立支撑:大树移栽后。必须及时进行树体固定,以防地面土层湿软,被大风吹刮而晃动,还有利于固定根系,促进根系生长。在进行设立支撑时,一般采用一般采用三柱支架正三角形支撑固定法,确保大树稳固,支撑点以树体高2/3处左右为宜。等到大树稳定之后,去除支撑。
(2)遮荫:遮荫材料最好选择遮荫度为70%的遮阳网,既避免了日光灼伤和水分过度散失,也保证了树体光合作用的进行。
(3)浇水:在大树移栽之后,应该立即进行浇水,从而保证水分的充足,并且可以使土壤和树根紧密相接,促进大树的根部生长。在移栽后应该根据情况进行浇水一般在5天到7天左右浇水一次,并应该连续浇水3——5次,在进行浇水的过程中应该遵循“不干不浇,浇则浇透”的原则进行浇水,从而保证大树水分的充足性。
(4)施肥喷药
在大树移栽之后,大树的根部会有损伤,因此根系吸收肥料的能力就会有所降低,这时可以采用一些速效肥料,比如硫酸铵、磷酸二氢钾、尿素等液肥进行施肥。在移栽之后也可以进行追肥,一般追施方法是叶面喷洒,追肥的时间为阴天或者早晚,遇降雨天气时要再喷1次。一般15 d左右追施1次。肥料浓度一般为0.2%一0.5%,如施尿素每株用量为0.1~025 kg,当年施肥1~2次,9月初停止施肥[4]。
大树在移栽之后,因修剪或者起苗等会对大树造成损伤,并且新长出的内叶或者幼芽抵抗能力比较低,所以大树很容感染病虫害,因此应该注意对大树的喷药,在喷药的过程中,可以采用托布津、多菌灵或者敌杀死等农药进行混和喷施,每周喷药1次,并且喷药时期一般在4月、7月、9月3个阶段。并且还应该根据树种特性和病虫害发生发展规律,勤检查,从而可以达到防治大树病虫害目的。
防寒防冻
在大树移栽之后,大树的生长会比较缓慢,而且大树的根系萌发比较迟,养分积累的比较少,组织不够充实,所以刚移栽的大树很容易受到低温或者空气变化的危害,因此应该做好大树的防寒防冻工作。在进行预防的过程中,可以在入秋后进行控制氮肥、增施磷肥、钾肥,从而提高树体的木质化程度 提高自身抗旱能力。然后在寒潮来临前,做好树木的保温工作,可以采取地面覆盖土壤或者是设立风障,塑料大棚等加强树木的保护,
在大树移栽之后,还应该做好宣传教育工作,在人流比较集中或其他易受人为或者禽畜等破坏的区域,并要做好宣传以及教育工作,同时,还可以进行设置竹篱等加以保护,从而保证大树移栽的成活率,促进园林绿化的建设。
参考文献:
[1]杨士雄;张晓军;刘志青:《大树移栽养护技术》现代农业科技;2011(7):
[2]郑翔;郑瑞杰;高荣海:《园林绿化中的大树移栽及养护管理技术》农业科技与装备;2010(4):254
[3]俞青娟;马庆红:《园林绿化中大树的移栽与养护技术》甘肃科技;2006,22(9):224
[4]蒋荣华;黄彩明:《大树移栽及养护技术探析》安徽农业科学;2008,36(28):12268--12269
作者简介:
夏晓明 男 1965.5 东台人 现职称:助理工程师 研究方向:园林绿化