一、情况简介孟家段水库上库,该工程于1982年才开始施工修筑,1983年竣工使用.陡坡工程交付使用2年后,由于泄水干渠渠底高于设计高程,而且狭窄,造成放水涡流回冲陡坡挡土墙,加之地下水位较高,渗流强,产生沸砂及流土,并有明水冲刷,致使原来砌筑的混凝土板(0.5×0.5×0.1米)全部塌陷打翻.1985年10月上级部门决定,进行工程翻修,并将海漫斜坡护砌加固1米.
I. Introduction Mengjiadu reservoir was built and the project was started construction and construction in 1982 and completed in 1983. After 2 years of delivery of the steep slope project, the bottom of the drainage canal is higher than the designed elevation and is narrow, resulting in drainage Eddy backflush steep slope retaining wall, combined with the high groundwater level, seepage flow, resulting in boiling sand and runoff, and Ming water flushing, resulting in the original masonry concrete slab (0.5 × 0.5 × 0.1 m) all collapse tip .1985 In October of that year, the superior department decided to renovate the project and reinforce the sea by 1 meter for slope protection.