论文部分内容阅读
用存贮理论求出了井下开采中最佳矿井生产周期和在该周期中应准备的可采煤量的计算公式.用动态规划技术可以获得同样的结果.并建议以控制回采工作面总长度来确保矿井生产的稳定性和连续性.
The storage theory is used to find out the optimal mine production cycle in underground mining and the formula to calculate the amount of coal that can be prepared in this cycle.The same result can be obtained by dynamic programming technology and it is suggested to control the total working face length To ensure the stability and continuity of mine production.