摘要:随着市场竞争的不断加大,建筑工程施工企业如何提高企业管理能力,提高市场竞争力成为了我国建筑施工企业的首要问题。建筑工程项目施工管理是建筑施工企业根据经营发展战略和企业内外条件,按照现代企业运行规律,通过生产诸要素的优化配置和动态管理,以实现工程项目的合同目标,获得良好的经济效益和社会效益。文章主要介绍了建筑施工管理概念及原则,从而针对建筑工程施工管理要素进行了分析,旨在加强建筑工程施工管理水平及保证工程的质量。
关键词:建筑工程 , 施工管理,原则,要素
Abstract: along with the market competition of the constantly increasing, building construction enterprise how to improve the enterprise management ability, improve market competitiveness in China the construction enterprises most important question. Building project construction management is building construction enterprise according to the business development strategy and enterprise internal and external conditions, in accordance with the modern enterprise operation rule, through the production elements of optimal allocation and dynamic management, in order to realize the goals of the project contract, for good economic benefit and social benefit. This paper mainly introduces the construction management concept and principle, thus of construction engineering construction management elements in the analysis, aims to strengthen building project construction management level and ensure the quality of the construction.
Keywords: building engineering, construction management, the principle and the elements
中图分类号:TU761 文献标识码:A 文章编号:
目前,我国的企业必须主要以市场为导向,强化项目管理理念,转换经营模式,增强应变能力,在竞争中学会生存,在拼搏中寻求发展。因此,加强建筑工程施工的管理已势在必行。
建筑施工企业由于种种原因,使得项目管理不善,各专业工程施工中的交叉配合与协调工作处理得不尽人意,尤其是工程施工后期,往往出现返工,造成工程投资的极大消费,既影响了工期,也影响到建筑物的使用功能,严重的甚至带来质量问题和安全隐患。为此工程施工中加强施工管理是相当重要。
1 建筑施工管理概念
建筑施工管理是建筑产品从施工准备开始到竣工验收、回访保修全过程的组织管理 其作为一个系统工程,具有施工面宽、流动性较大、不可预见因素较多、容易受外界因素影响等特点,而工程项目的施工管理对于工程质量又起着至关重要的作用。目前,我国的建筑施工企业在工程项目施工管理方面,已逐步形成了具有现代管理意识的建筑工程项目施工管理 在实际工程项目中新结构、新材料以及各种新技术、新工艺不断出现,相应的施工管理也在不断发展。
2 建筑施工管理的原则
建筑施工管理的原则主要体现在以下几个方面:
(1)适应市场的需求。市场是动态的、变化的,只有适应市场才能有所作为,才能获得效益,它包括为社会创造的效益和为企业创造的经济效益。
(2)提升企业文化效益。高素质的企业在激烈竞争的市场中,才能及时明确自身的市场定位,税务研讨论文能够适应千变万化的市场需求,才能在市场中生存、发展。所以在进行项目施工管理创新过程中,以不断充实、更新企业各级管理层;通过项目的实施为企业开拓市场;使项目部成为企业开拓市场的前沿阵地;通过项目的实施不断熟悉了解市场,为企业的改革创新提供市场信息。
(3)促进生产力的发展。生产力发展的水平不同对管理模式的要求也不同。两者是相互促进、相互制约的,只有生产力的三个要素,即劳动者、劳动对象、劳动工具有效的结合,才能发挥潜在的生产力。在市场经济时期,劳动对象是要靠市场竞争才能获得,使生产力的三要素很好的有效的协调组合,充分发挥并使之发展。
3 建筑工程施工管理要素分析
3.1 实行目标组织的协调控制
实行有目标的组织协调控制是基层施工技术的一项十分关键的工作。在施工全过程中按照设计和有关技术、经济文件的要求,围绕着质量、工期、成本等制定施工目标,在每个阶段、每个工序、每项施工任务中积极组织平衡,严格协调控制,使施工中人、财、物和各种关系能够保持最好的结合,确保工程的顺利进行。还要严格质量自检、互检、交接检的制度,即使进行工程隐检、预检,并督促有关人员做好分部分项工程质量评定。
3.2 现场施工管理
(1)对施工进度计划的贯彻。施工进度计划是现场施工管理的主要依据,根据施工方案编制的进度计划进行施工,但施工进度计划是一个动态过程,受各种主客观因素的影响,实际进度与计划进度发生差异是常有的事,所以要定期及时地检查,掌握实际情况,分析进度超前或推后的原因,研究对策和措施,保证整个工程施工进度计划的实施。
(2)对施工过程中的检查。包括施工是否按图施工,是否符合设计要求;是否贯彻施工组织设计的施工顺序和施工方法,施工是否遵守操作规程;对测量放线及各施工过程的技术检查和复核,要求符合图纸规定,符合质量,误差应控制在技术和标准允许的范围内;对材料、半成品、生产设备均须由供应单位提出合格证明文件;隐蔽工程要符合质量检查的规定,并做必要的记录。
(3)施工总平面管理。这是全场性工作,施工是动态的,进展的,不同階段施工平面布置的内容也不同,所以施工现场都必须以施工组织设计所确定的施工总平面规划为依据,根据各施工单位不同时间对施工平面的要求,进行经常性的管理工作及时做好调整才能合理使用场地。
(4)保证现场交通道路和排水系统畅通以及文明施工。检查施工总平面规划的贯彻执行情况,指定材料、成品、半成品和生产设备的堆放位置;确定大型暂设工程的位置和使用分配。如增设、拆迁时,要经过有关部门批准方能执行;保证施工用水、用电、排水沟渠的畅通无阻;对于现场局部停水、停电,事先要有计划;保证道路畅通。施工道路、轨道等交通线路上不准堆放材料,加强道路的维修,及时处理障碍物;签署和审批建筑物、构筑物、管线、道路等工程的开工申请;根据施工过程,不断修正施工总平面图。
3.3施工进度控制
(1)建筑工程进度控制对于整个工程项目的管理以及企业信誉具有重要影响。因此,做好工程进度控制管理,确保整个项目保质保量按期交工,是工程总承包单位经常遇到和需要不断解决的问题。建立一个有权威的、有组织能力、效率高的项目领导机构,组织机构根据项目的特点、规模、专业性质等要求设置,做到因岗设人、办事高效、结构科学合理,并层层分解工期目标,落实责任,订立制度保证目标的实现,都是实际中有力的组织措施。
(2)对有些工序采取技术组织措施(如采用三班制),增加人力、设备等,从而以可能的加快时间代替原来的工序所需时间。加快关键工序是最重要的。当关键工序缩短后,可能原来的非关键工序变成了关键工序,若仍无法满足要求,对新的关键工序也应进行调整。可延长一些非关键工序的持续时间,从非关键工序中调动一些资源到关键工作上,以缩短关键工序的持续时间。当上述办法仍不能满足工期要求时,应考虑新的工艺方案,开辟新的施工顺序和相互关系。如用平行作业代替流水作业。
(3)施工资源的合理配置是工程进度计划的一个重要组成部分。资源强度是指单位时段内使用某种资源的数量。各种资源对其强度的限制和均衡有不同的要求。人力资源,主要是某些技术工种的人力受到限制。然而,人力资源在时间上的均衡更为重要。例如一些大型工程地处偏僻,倘若在施工期的某段时间需要的人数很多,势必增加更多的临时配套设施。施工机械的均衡和限制实际上是对大型施工机械而言。主要施工机械(如大型起重机、挖土机、运输汽车等)可能获得的台数或工作面可能布置的机械数量,常常决定了主要工程量可达到的最大施工强度。为此,在安排施工进度时,需要考虑大型施工机械的及时转移,使用同一种大型施工机械的各个工序上相互衔接,避免时间上的重叠。
(4)技术措施也是加促工程进展的另一重要环节。施工方法的选择既要先进,又要可靠,选择成熟的技术。内部要及时收集实际施工进度数据,与计划进度进行比较,找出偏差,分析原因,制订相应的措施,以保证工程的顺利进行。
3.4 加强外带劳务管理
外部劳务工的使用與管理是施工企业适度规模扩张和追求效益最大化的有效途径,加强外部劳务工的管理,在施工管理上是不可忽视的一面。
(1)规范使用制度坚持“以我为主,为我使用,合理有序,考核业绩,注重实力”的方针,坚持劳务使用“基地化、弹性化”的制度和关键、重点岗位禁用外部劳务的制度。
(2)加强动态管理突出“两个原则”,抓好“ 三个重点” “两个原则”,即:坚持“谁用工谁负责”和“教育、使用、管理并举”的原则。“三个重点”,即:抓好现场代表、技术监督人员选派工作.实行分包工程施工全过程“旁站”制度,确保分包工程安全、质量和工期监管有效;抓好分包工程物资采供和验工计价等管理工作,堵塞效益流失渠道;抓好外部劳务制度化管理,适时进行政策传统、形势任务、安全质量、遵纪守法和工艺技术教育,以良好的政治、技术、管理素质和精神风貌,维护施工企业的信誉和形象。
(3)严格资质审查与分包做到资质审查“两严”、分包“三必须”。“两严”,即:严格遵循分包评价程序;严查综合实力(设备、技术、资金、业绩等)。“三必须”,即:必须签订和履行规范合法的经济合同:必须保证重难点和高技术含量工程以自有队伍为骨干:必须杜绝整体分包和层层转包。
3.5安全管理专项小组
确保现场施工安全,是施工管理的基础之一,更是工程施工进度的保证。成立安全管理专项小组,并设专职安全员,贯彻上级精神,制订具体的安全规程和违章处理措施,每天定时、不定时检查工程施工现场安全工作,发现问题即时处理,并定期向公司安全领导小组汇报。此外,对进场的工人进行摸底测试,统一进行安全教育,增强质量、安全意识,让之认真学习和深刻体会施工技术规范和施工安全规范。经过培训交底达到合格的职工才允许上岗操作,为安全工作顺利开展打下坚实的基础。
4 结束语
一个好的企业,必然有一套好的管理方式,所以建筑施工企业应当重视建筑施工管理工作,这直接关系到企业的经营效益及企业存亡的问题。要做好这项工作,需要建筑施工企业认真分析自身的特点,充分利用自已的长处,采取科学的方法提高施工管理素质。以上只是探讨了建筑施工管理中施工技术管理、质量管理和安全管理等方面的基本认识和做法。在实际工程项目中,还需要结合各项目的特点,进一步细化管理中的各项工作,才能按时保质地完成施工任务。
参考文献
[1]袁靖.试论建筑工程的施工管理[J].民营科技,2009,(11).
[2]施永.建筑施工工程项目的成本管理与控制[J].中国高新技术企业,2009,(20).
[3]周伟锋,谭蔚.现场施工管理存在的问题与对策[J].中国新技术新产品,2009,(22).
关键词:建筑工程 , 施工管理,原则,要素
Abstract: along with the market competition of the constantly increasing, building construction enterprise how to improve the enterprise management ability, improve market competitiveness in China the construction enterprises most important question. Building project construction management is building construction enterprise according to the business development strategy and enterprise internal and external conditions, in accordance with the modern enterprise operation rule, through the production elements of optimal allocation and dynamic management, in order to realize the goals of the project contract, for good economic benefit and social benefit. This paper mainly introduces the construction management concept and principle, thus of construction engineering construction management elements in the analysis, aims to strengthen building project construction management level and ensure the quality of the construction.
Keywords: building engineering, construction management, the principle and the elements
中图分类号:TU761 文献标识码:A 文章编号:
目前,我国的企业必须主要以市场为导向,强化项目管理理念,转换经营模式,增强应变能力,在竞争中学会生存,在拼搏中寻求发展。因此,加强建筑工程施工的管理已势在必行。
建筑施工企业由于种种原因,使得项目管理不善,各专业工程施工中的交叉配合与协调工作处理得不尽人意,尤其是工程施工后期,往往出现返工,造成工程投资的极大消费,既影响了工期,也影响到建筑物的使用功能,严重的甚至带来质量问题和安全隐患。为此工程施工中加强施工管理是相当重要。
1 建筑施工管理概念
建筑施工管理是建筑产品从施工准备开始到竣工验收、回访保修全过程的组织管理 其作为一个系统工程,具有施工面宽、流动性较大、不可预见因素较多、容易受外界因素影响等特点,而工程项目的施工管理对于工程质量又起着至关重要的作用。目前,我国的建筑施工企业在工程项目施工管理方面,已逐步形成了具有现代管理意识的建筑工程项目施工管理 在实际工程项目中新结构、新材料以及各种新技术、新工艺不断出现,相应的施工管理也在不断发展。
2 建筑施工管理的原则
建筑施工管理的原则主要体现在以下几个方面:
(1)适应市场的需求。市场是动态的、变化的,只有适应市场才能有所作为,才能获得效益,它包括为社会创造的效益和为企业创造的经济效益。
(2)提升企业文化效益。高素质的企业在激烈竞争的市场中,才能及时明确自身的市场定位,税务研讨论文能够适应千变万化的市场需求,才能在市场中生存、发展。所以在进行项目施工管理创新过程中,以不断充实、更新企业各级管理层;通过项目的实施为企业开拓市场;使项目部成为企业开拓市场的前沿阵地;通过项目的实施不断熟悉了解市场,为企业的改革创新提供市场信息。
(3)促进生产力的发展。生产力发展的水平不同对管理模式的要求也不同。两者是相互促进、相互制约的,只有生产力的三个要素,即劳动者、劳动对象、劳动工具有效的结合,才能发挥潜在的生产力。在市场经济时期,劳动对象是要靠市场竞争才能获得,使生产力的三要素很好的有效的协调组合,充分发挥并使之发展。
3 建筑工程施工管理要素分析
3.1 实行目标组织的协调控制
实行有目标的组织协调控制是基层施工技术的一项十分关键的工作。在施工全过程中按照设计和有关技术、经济文件的要求,围绕着质量、工期、成本等制定施工目标,在每个阶段、每个工序、每项施工任务中积极组织平衡,严格协调控制,使施工中人、财、物和各种关系能够保持最好的结合,确保工程的顺利进行。还要严格质量自检、互检、交接检的制度,即使进行工程隐检、预检,并督促有关人员做好分部分项工程质量评定。
3.2 现场施工管理
(1)对施工进度计划的贯彻。施工进度计划是现场施工管理的主要依据,根据施工方案编制的进度计划进行施工,但施工进度计划是一个动态过程,受各种主客观因素的影响,实际进度与计划进度发生差异是常有的事,所以要定期及时地检查,掌握实际情况,分析进度超前或推后的原因,研究对策和措施,保证整个工程施工进度计划的实施。
(2)对施工过程中的检查。包括施工是否按图施工,是否符合设计要求;是否贯彻施工组织设计的施工顺序和施工方法,施工是否遵守操作规程;对测量放线及各施工过程的技术检查和复核,要求符合图纸规定,符合质量,误差应控制在技术和标准允许的范围内;对材料、半成品、生产设备均须由供应单位提出合格证明文件;隐蔽工程要符合质量检查的规定,并做必要的记录。
(3)施工总平面管理。这是全场性工作,施工是动态的,进展的,不同階段施工平面布置的内容也不同,所以施工现场都必须以施工组织设计所确定的施工总平面规划为依据,根据各施工单位不同时间对施工平面的要求,进行经常性的管理工作及时做好调整才能合理使用场地。
(4)保证现场交通道路和排水系统畅通以及文明施工。检查施工总平面规划的贯彻执行情况,指定材料、成品、半成品和生产设备的堆放位置;确定大型暂设工程的位置和使用分配。如增设、拆迁时,要经过有关部门批准方能执行;保证施工用水、用电、排水沟渠的畅通无阻;对于现场局部停水、停电,事先要有计划;保证道路畅通。施工道路、轨道等交通线路上不准堆放材料,加强道路的维修,及时处理障碍物;签署和审批建筑物、构筑物、管线、道路等工程的开工申请;根据施工过程,不断修正施工总平面图。
3.3施工进度控制
(1)建筑工程进度控制对于整个工程项目的管理以及企业信誉具有重要影响。因此,做好工程进度控制管理,确保整个项目保质保量按期交工,是工程总承包单位经常遇到和需要不断解决的问题。建立一个有权威的、有组织能力、效率高的项目领导机构,组织机构根据项目的特点、规模、专业性质等要求设置,做到因岗设人、办事高效、结构科学合理,并层层分解工期目标,落实责任,订立制度保证目标的实现,都是实际中有力的组织措施。
(2)对有些工序采取技术组织措施(如采用三班制),增加人力、设备等,从而以可能的加快时间代替原来的工序所需时间。加快关键工序是最重要的。当关键工序缩短后,可能原来的非关键工序变成了关键工序,若仍无法满足要求,对新的关键工序也应进行调整。可延长一些非关键工序的持续时间,从非关键工序中调动一些资源到关键工作上,以缩短关键工序的持续时间。当上述办法仍不能满足工期要求时,应考虑新的工艺方案,开辟新的施工顺序和相互关系。如用平行作业代替流水作业。
(3)施工资源的合理配置是工程进度计划的一个重要组成部分。资源强度是指单位时段内使用某种资源的数量。各种资源对其强度的限制和均衡有不同的要求。人力资源,主要是某些技术工种的人力受到限制。然而,人力资源在时间上的均衡更为重要。例如一些大型工程地处偏僻,倘若在施工期的某段时间需要的人数很多,势必增加更多的临时配套设施。施工机械的均衡和限制实际上是对大型施工机械而言。主要施工机械(如大型起重机、挖土机、运输汽车等)可能获得的台数或工作面可能布置的机械数量,常常决定了主要工程量可达到的最大施工强度。为此,在安排施工进度时,需要考虑大型施工机械的及时转移,使用同一种大型施工机械的各个工序上相互衔接,避免时间上的重叠。
(4)技术措施也是加促工程进展的另一重要环节。施工方法的选择既要先进,又要可靠,选择成熟的技术。内部要及时收集实际施工进度数据,与计划进度进行比较,找出偏差,分析原因,制订相应的措施,以保证工程的顺利进行。
3.4 加强外带劳务管理
外部劳务工的使用與管理是施工企业适度规模扩张和追求效益最大化的有效途径,加强外部劳务工的管理,在施工管理上是不可忽视的一面。
(1)规范使用制度坚持“以我为主,为我使用,合理有序,考核业绩,注重实力”的方针,坚持劳务使用“基地化、弹性化”的制度和关键、重点岗位禁用外部劳务的制度。
(2)加强动态管理突出“两个原则”,抓好“ 三个重点” “两个原则”,即:坚持“谁用工谁负责”和“教育、使用、管理并举”的原则。“三个重点”,即:抓好现场代表、技术监督人员选派工作.实行分包工程施工全过程“旁站”制度,确保分包工程安全、质量和工期监管有效;抓好分包工程物资采供和验工计价等管理工作,堵塞效益流失渠道;抓好外部劳务制度化管理,适时进行政策传统、形势任务、安全质量、遵纪守法和工艺技术教育,以良好的政治、技术、管理素质和精神风貌,维护施工企业的信誉和形象。
(3)严格资质审查与分包做到资质审查“两严”、分包“三必须”。“两严”,即:严格遵循分包评价程序;严查综合实力(设备、技术、资金、业绩等)。“三必须”,即:必须签订和履行规范合法的经济合同:必须保证重难点和高技术含量工程以自有队伍为骨干:必须杜绝整体分包和层层转包。
3.5安全管理专项小组
确保现场施工安全,是施工管理的基础之一,更是工程施工进度的保证。成立安全管理专项小组,并设专职安全员,贯彻上级精神,制订具体的安全规程和违章处理措施,每天定时、不定时检查工程施工现场安全工作,发现问题即时处理,并定期向公司安全领导小组汇报。此外,对进场的工人进行摸底测试,统一进行安全教育,增强质量、安全意识,让之认真学习和深刻体会施工技术规范和施工安全规范。经过培训交底达到合格的职工才允许上岗操作,为安全工作顺利开展打下坚实的基础。
4 结束语
一个好的企业,必然有一套好的管理方式,所以建筑施工企业应当重视建筑施工管理工作,这直接关系到企业的经营效益及企业存亡的问题。要做好这项工作,需要建筑施工企业认真分析自身的特点,充分利用自已的长处,采取科学的方法提高施工管理素质。以上只是探讨了建筑施工管理中施工技术管理、质量管理和安全管理等方面的基本认识和做法。在实际工程项目中,还需要结合各项目的特点,进一步细化管理中的各项工作,才能按时保质地完成施工任务。