论文部分内容阅读
和静县备战铁矿采选工程水土保持方案编制的目的是明确建设单位法定的水土流失防治责任与义务,优化或完善主体工程设计,从水土保持角度给出项目是否可行的实施方案。本文通过对实例水土保持方案的比选进行分析,从工程选址、施工占地、主体工程设计和挖填土方等方面介绍了铁矿工程水土保持方法和注意事项,为同类型工程水土保持提供参考。
The purpose of preparation of soil and water conservation plans for the preparation and selection project of Beiming Iron Mine in Hejing County is to clarify the responsibility and obligation of legal control over soil and water loss in construction units and to optimize or perfect the design of the main part of the project so as to give feasible implementation plans of the project from the perspective of soil and water conservation. Based on the analysis of the comparison and selection of soil and water conservation plans, this paper introduces the methods and precautions of soil and water conservation for iron ore projects in terms of site selection, construction land occupation, main engineering design and excavation and filling of earth and soil. for reference.