论文部分内容阅读
本文对水电站工程重力坝混凝土裂缝产生的原因进行了分析,表明混凝土裂缝处理的重要性,并针对具体工程探讨了裂缝的控制和处理,以供参考。
This paper analyzes the causes of the concrete cracks in the gravity dam of the hydropower project, points out the importance of the concrete cracks treatment, and discusses the control and treatment of cracks for the specific projects for reference.