【摘要】随着城市发展水平的逐步提
高和建设速度的不断加快,给市政给水管道
建设带来了新的挑战。管道施工的设计与管
理工作在工程建设过程中显得越发重要。目
前我国从事市政给水管道施工建设的队伍
其施工技术还不完善。施工经验还不足,面
对市政给水管道建设的高要求与不断变化
的发展状况,很难保障给水管道施工的整体
质量,本文认真分析了目前我国市政给水工
程發展的主要趋势,并在此基础上从质量角
度提出了相应的管理措施。
【关键词】给水管道;施工;质量;管
理措施
Abstract: Along with the city development level gradually.
High and the accelerating pace of construction, to the municipal water supply pipeline. Construction has brought new challenges. And the design of pipeline construction .Working in the process of engineering construction becomes more and more important. Eye Team engaged in municipal water supply pipeline construction in China. Its construction technology is not perfect. Construction experience, surface. High requirements of the municipal water supply pipeline construction and changing. The development status, it is difficult to guarantee water supply pipeline construction overall. Quality, this paper analyzes the current our country municipal water supply engineering. The main trend of history development, and on this basis from qualityangle. Putsforward the corresponding management measures.
Keywords: water supply pipeline; construction; quality; management
中图分类号:TU99
1目前我国市政给水工程发展的主喜
趋势
就日前我国市政给水工程发展的实际
情况来看,市政给水工程的发展趋势主要可
以归纳为以下几点:
第一,给水工程的引水线路在长度上越
来越长。受城市用水需求进一步增加的影
响,市区周围的水源无论是在供水数量还是
在供水质量上都已无法满足城市用水的基
本需求,长距离引水工程将发展成为我国市
政给水管道建设的必然趋。
第二,水厂净化工作的基本要求将更加
严格。受经济发展影响,水资源污
染问题日益严峻,这一现实问题直接影
响着水厂净化工作。面对水污染的日益严
重,水厂净化工作将变得吏加复杂,净化工
艺也要不断提高。
第三,我国市政给水工程建设外资注入
越来越多。据有关数据调奁显示改革开放以
来我国市政给水丁程建设项目引入外资的
比例成逐年上升趋势,现阶段已经有129个
国家级给水工程项目引入了外资。外资在我
国市政给水工程建设中的投资比例与投资
数量还将在今后的工程建设过程中继续扩
大。
第四,水厂自动化水平将进一步提高并
逐步趋近于普及状态。随着科学技术水平的
逐步提高,现代化的新型自动化设备、供水
器材、先进仪表已经被广泛的运用到水厂当
中,数控技术同时也被引入水厂运行管理当
中,这些都极大地提高了水厂的自动化程
度。
第五,分质供水与广域供水系统越来越
多。一些经济发达地区或水源受到较多污染
的城市,已开始兴建区域性双给水系统的试
点工程。某些城市也已经被建设部列为推行
分质供水的试点城市。广域供水系统即一个
水源工程供应几个城市使用。
2市政给水工程的施工准备工作
2.1原材料的选择与运用
钢筋、水泥、木材是进行市政给水管道
旌工建设的主要材料,原材料的质量决定着
工程建设的质量,为此必须保障建筑材料的
各项指标符合丁程建设需要,材料选购与进
场验收要层层把关。此外还要确保材料供应
商能够及时、足量的满足,工程建设的需求。
施工材料在运输过程中要加强运输保护,进
入施工现场后要由专门人员进行入库管理,
避免因管理不到位造成材料损坏与变质。材
料使用前一定要在施工现场预制砼块,确保
试验合格后才能够投入使用。材料管理人员
要对库存材料进行不定期的清点,及时掌握
工程进度对材料的需求状况,避免出现供料
不及导致的停工问题出现。
2.2砼、砂浆试验
工程施工前需做现场试验,以确定半成品的物理力学性能指标,确定最佳施工参数、施工工艺,提供质晕控制指标及检验控制办法。根据试验记录,整理出试验成果报告,报工程师审批,按批复意见实施。砼及砂浆配合比试验,按呈报工程师批准的原材料,并按《规范》规定和设计强度,在室内作不同品种水泥、不同外加剂掺量与砼的抗压强度关系,砂率选择、用水量与坍落度关系等一系列试验,从中分析挑选出最优的配合比。写成书面试验报告,呈送工程师批准,作为砼及砂浆试制的依据。
2.3基线复核及测量
放线根据提供的测量控制点及精度要
求,在动工前应复核资料和数据的准确性。
管道的起点、终点及转折点是管道施工的重
点,管道中线定位就是将主点位置测设到地
面上去,并用本桩标定。
3进行市政给水管道工程施工管理的
具体措施
3.1工程质量保障措施
首先,要明确各责任主体的具体职责范
围,具体工作内容要有专人负责,尤其是对
工程建设质量有着决定性影响的重要建设
环节与施工部位,在施工现场质检人员要进
行严格现场的监督与检查,把好质量关。其
次,要认真贯彻落实质量否决制度。质检工
作要坚持执行自检、专检、联检“三检”相结
合的质检工作方针。工程建设的各个工序必
须由质检人员逐一进行验收,只有上一道工
序合格后方可进行下一道施工工序。再次,
认真贯彻落实执行证上岗制度,对主要工种
和工序安装应做出标记,作好施工记录。最
后。要做好施工技术交底工作,招待三级交
底制度,项目技术负责人的施工工长进行技
术交底,施工工长向施工班组长进行交底,
施丁班组长在工序施工前应向具体操作人
员进行技术交底,且应有书面交底资料,口
头交底应作好记录。
3.2工程施工进度保障措施
项目经理在保障工程施工进度方面发
挥了非常重要的作用,项目经理存开工之初
要及时组建项目部并为施工班组配备相应
的技术人员,为工程建设的顺利开展提供组
织保障与技术支持。施工单位要对工程进度
做到心中有数,将用工时间合理的分配到每
道施工工序当中,并在施工过程中确保每道
施工工序在规定时间内保质保量的完成,当
不到上一工序延期时,要尽量在下一工序通
过加班尽量补上前一道工序落下的进度。施
工按照流水作业进行每工序前应做好施工
准备。通过工序的合理安排和及时调整,在
质量,技术,组织等措施的促进下,合理配
置人,机,财,物等要素。高效合理地安排
工程进度。科学运作,保证在建设单位的要
求和需求时间内全面,优质地完成工程。
3.3工程建设施工安全保障措旅
项目经理是施工项目安全管理第一责
任人。项目部安全负责人负责该工程的安全
管理工作。工地设安全员,负责整个工地的
安全工作,查安全隐患,定安全措施,进行
安全防护。发现安全隐患及时上报处理。由
安全员组织施工人员学习《安全技术操作规
程》,增强工人的安全意识。安检部对工程
的安全工作定期进行检查,要查思想,查制
度、查现场、查隐患、查事故处理等。施工
作业人员要遵守建设单位和施工单位的安
全规章制度和《安全操作规程》。
3.4加强施工技术管理的具体措施
工程技术人员作为技术管理的主体在
工程建设初期要进行技术交底工作,加强部
门之间的交流与合作。明确工程施工技术基
本要求。施工过程中工程技术人员要加强施
工现场的技术管理,保障工程建设符合具体
的施工技术要求。技术管理人员在管理过程
中还要严格执行各项技术管理制度,努力提
高自身的管理水平与能力。
4总结
给水管道施工建设作为市政工程的重
要发展内容,是城市发展与建设至关重要的
基础设施,在给水管道施工建设过程中要综
合运用各种手段,提高工程质量管理水平,
加强工程建设各个环节的监督与控制,在工
程建设过程中要将保障工程建设质量放在
市政给水管道建设发展的首位。
参考文献:
【1】王虹.浅谈市政给排水管道工程的设计与施工【J】.价值工程,2010,(36).
【2】黄青松,谢为民.市政排水管道工程施工质量控制【J】现代经济信息,2010,(01).
【3】胡智深.浅谈市政排水工程常见问题的防治及养护维修对策【J】.沿海企业与科技.2007,(01).
高和建设速度的不断加快,给市政给水管道
建设带来了新的挑战。管道施工的设计与管
理工作在工程建设过程中显得越发重要。目
前我国从事市政给水管道施工建设的队伍
其施工技术还不完善。施工经验还不足,面
对市政给水管道建设的高要求与不断变化
的发展状况,很难保障给水管道施工的整体
质量,本文认真分析了目前我国市政给水工
程發展的主要趋势,并在此基础上从质量角
度提出了相应的管理措施。
【关键词】给水管道;施工;质量;管
理措施
Abstract: Along with the city development level gradually.
High and the accelerating pace of construction, to the municipal water supply pipeline. Construction has brought new challenges. And the design of pipeline construction .Working in the process of engineering construction becomes more and more important. Eye Team engaged in municipal water supply pipeline construction in China. Its construction technology is not perfect. Construction experience, surface. High requirements of the municipal water supply pipeline construction and changing. The development status, it is difficult to guarantee water supply pipeline construction overall. Quality, this paper analyzes the current our country municipal water supply engineering. The main trend of history development, and on this basis from qualityangle. Putsforward the corresponding management measures.
Keywords: water supply pipeline; construction; quality; management
中图分类号:TU99
1目前我国市政给水工程发展的主喜
趋势
就日前我国市政给水工程发展的实际
情况来看,市政给水工程的发展趋势主要可
以归纳为以下几点:
第一,给水工程的引水线路在长度上越
来越长。受城市用水需求进一步增加的影
响,市区周围的水源无论是在供水数量还是
在供水质量上都已无法满足城市用水的基
本需求,长距离引水工程将发展成为我国市
政给水管道建设的必然趋。
第二,水厂净化工作的基本要求将更加
严格。受经济发展影响,水资源污
染问题日益严峻,这一现实问题直接影
响着水厂净化工作。面对水污染的日益严
重,水厂净化工作将变得吏加复杂,净化工
艺也要不断提高。
第三,我国市政给水工程建设外资注入
越来越多。据有关数据调奁显示改革开放以
来我国市政给水丁程建设项目引入外资的
比例成逐年上升趋势,现阶段已经有129个
国家级给水工程项目引入了外资。外资在我
国市政给水工程建设中的投资比例与投资
数量还将在今后的工程建设过程中继续扩
大。
第四,水厂自动化水平将进一步提高并
逐步趋近于普及状态。随着科学技术水平的
逐步提高,现代化的新型自动化设备、供水
器材、先进仪表已经被广泛的运用到水厂当
中,数控技术同时也被引入水厂运行管理当
中,这些都极大地提高了水厂的自动化程
度。
第五,分质供水与广域供水系统越来越
多。一些经济发达地区或水源受到较多污染
的城市,已开始兴建区域性双给水系统的试
点工程。某些城市也已经被建设部列为推行
分质供水的试点城市。广域供水系统即一个
水源工程供应几个城市使用。
2市政给水工程的施工准备工作
2.1原材料的选择与运用
钢筋、水泥、木材是进行市政给水管道
旌工建设的主要材料,原材料的质量决定着
工程建设的质量,为此必须保障建筑材料的
各项指标符合丁程建设需要,材料选购与进
场验收要层层把关。此外还要确保材料供应
商能够及时、足量的满足,工程建设的需求。
施工材料在运输过程中要加强运输保护,进
入施工现场后要由专门人员进行入库管理,
避免因管理不到位造成材料损坏与变质。材
料使用前一定要在施工现场预制砼块,确保
试验合格后才能够投入使用。材料管理人员
要对库存材料进行不定期的清点,及时掌握
工程进度对材料的需求状况,避免出现供料
不及导致的停工问题出现。
2.2砼、砂浆试验
工程施工前需做现场试验,以确定半成品的物理力学性能指标,确定最佳施工参数、施工工艺,提供质晕控制指标及检验控制办法。根据试验记录,整理出试验成果报告,报工程师审批,按批复意见实施。砼及砂浆配合比试验,按呈报工程师批准的原材料,并按《规范》规定和设计强度,在室内作不同品种水泥、不同外加剂掺量与砼的抗压强度关系,砂率选择、用水量与坍落度关系等一系列试验,从中分析挑选出最优的配合比。写成书面试验报告,呈送工程师批准,作为砼及砂浆试制的依据。
2.3基线复核及测量
放线根据提供的测量控制点及精度要
求,在动工前应复核资料和数据的准确性。
管道的起点、终点及转折点是管道施工的重
点,管道中线定位就是将主点位置测设到地
面上去,并用本桩标定。
3进行市政给水管道工程施工管理的
具体措施
3.1工程质量保障措施
首先,要明确各责任主体的具体职责范
围,具体工作内容要有专人负责,尤其是对
工程建设质量有着决定性影响的重要建设
环节与施工部位,在施工现场质检人员要进
行严格现场的监督与检查,把好质量关。其
次,要认真贯彻落实质量否决制度。质检工
作要坚持执行自检、专检、联检“三检”相结
合的质检工作方针。工程建设的各个工序必
须由质检人员逐一进行验收,只有上一道工
序合格后方可进行下一道施工工序。再次,
认真贯彻落实执行证上岗制度,对主要工种
和工序安装应做出标记,作好施工记录。最
后。要做好施工技术交底工作,招待三级交
底制度,项目技术负责人的施工工长进行技
术交底,施工工长向施工班组长进行交底,
施丁班组长在工序施工前应向具体操作人
员进行技术交底,且应有书面交底资料,口
头交底应作好记录。
3.2工程施工进度保障措施
项目经理在保障工程施工进度方面发
挥了非常重要的作用,项目经理存开工之初
要及时组建项目部并为施工班组配备相应
的技术人员,为工程建设的顺利开展提供组
织保障与技术支持。施工单位要对工程进度
做到心中有数,将用工时间合理的分配到每
道施工工序当中,并在施工过程中确保每道
施工工序在规定时间内保质保量的完成,当
不到上一工序延期时,要尽量在下一工序通
过加班尽量补上前一道工序落下的进度。施
工按照流水作业进行每工序前应做好施工
准备。通过工序的合理安排和及时调整,在
质量,技术,组织等措施的促进下,合理配
置人,机,财,物等要素。高效合理地安排
工程进度。科学运作,保证在建设单位的要
求和需求时间内全面,优质地完成工程。
3.3工程建设施工安全保障措旅
项目经理是施工项目安全管理第一责
任人。项目部安全负责人负责该工程的安全
管理工作。工地设安全员,负责整个工地的
安全工作,查安全隐患,定安全措施,进行
安全防护。发现安全隐患及时上报处理。由
安全员组织施工人员学习《安全技术操作规
程》,增强工人的安全意识。安检部对工程
的安全工作定期进行检查,要查思想,查制
度、查现场、查隐患、查事故处理等。施工
作业人员要遵守建设单位和施工单位的安
全规章制度和《安全操作规程》。
3.4加强施工技术管理的具体措施
工程技术人员作为技术管理的主体在
工程建设初期要进行技术交底工作,加强部
门之间的交流与合作。明确工程施工技术基
本要求。施工过程中工程技术人员要加强施
工现场的技术管理,保障工程建设符合具体
的施工技术要求。技术管理人员在管理过程
中还要严格执行各项技术管理制度,努力提
高自身的管理水平与能力。
4总结
给水管道施工建设作为市政工程的重
要发展内容,是城市发展与建设至关重要的
基础设施,在给水管道施工建设过程中要综
合运用各种手段,提高工程质量管理水平,
加强工程建设各个环节的监督与控制,在工
程建设过程中要将保障工程建设质量放在
市政给水管道建设发展的首位。
参考文献:
【1】王虹.浅谈市政给排水管道工程的设计与施工【J】.价值工程,2010,(36).
【2】黄青松,谢为民.市政排水管道工程施工质量控制【J】现代经济信息,2010,(01).
【3】胡智深.浅谈市政排水工程常见问题的防治及养护维修对策【J】.沿海企业与科技.2007,(01).