论文部分内容阅读
津浦线公里344+279黄河特大桥(以下简称黄河铁路大桥)位于济南泺口与鹊山两站间。始建于1909年4月(清宣统二年四月),1912年10月(民国元年)竣工,由德国三山桥梁公司承建为我国当时铁路最大之桥梁。全桥由12孔组成,第1至8孔和第12孔跨度为91.5m,简支下承钢桁梁结构;第9、10、11孔为悬臂钢梁锚定结构,跨度为128.1m,中部第10
Jin Pu km kilometers 344 + 279 Yellow River Bridge (hereinafter referred to as the Yellow River Railway Bridge) is located in Jinan mouth and Queshan two stations. Founded in April 1909 (Qing Xuan Tong two years in April), in October 1912 (the first year of the Republic of China) completed by the German Sanshan Bridge Company contracted as China’s then the largest railway bridge. The whole bridge is composed of 12 holes, the span of holes 1 to 8 and the 12th hole is 91.5m, and the steel truss girder structure is simply supported; the 9th, 10th and 11th holes are cantilever steel girder anchoring structure with a span of 128.1m, Central 10th