《水库调洪演算问题》一文(见原水利电力部《水利水电技术》1980年第4期)介绍了国外水库逆时序洪水演算方法,该法虽有突出的优点,但仍需使用两条工作曲线。笔者于1965年提出的调洪全图解法与上述方法相比,节省了一条工作曲线及逐时段查读计算中间值的步骤,且顺时序、逆时序均可图解,无论在演算速度上或成果精度上均有显著改善。现
The article “Calculation problem of reservoir flood regulation” (see the original water conservancy and Electric Power Ministry “water conservancy and hydropower technology” 1980 the fourth period) introduces the reservoir reverse time series flood calculation method, although the law has outstanding advantages, but still need to use two work curve. Compared with the above method, the author has saved a working curve and a step-by-step investigation of calculating intermediate values in 1965. In addition, the clockwise sequence and the reverse sequence can be illustrated, both in the speed of calculation and the result The accuracy is significantly improved. Now