论文部分内容阅读
主要结合厦深线引入深圳枢纽,根据地区客货运需求,结合城市规划,理顺客货列车径路和各客站分工,优化枢纽运输组织,充分发挥铁路运输设备的能力,实现点线能力配套。
The project will be mainly integrated with Xiamen-Shenzhen Line and introduced into Shenzhen hub. According to the demand of passenger and cargo in the area, combined with urban planning, the passenger and freight trains will be straightened out and the division of labor among passenger stations will be rationalized. The hub transport organization will be optimized and the railway transport equipment will be given full play.