沼气工程施工与验收的技术要求可参照《沼气工程技术规范第3部分:施工与验收》(NY/T1220.3-2006)的规定执行。1施工前的技术准备(1)工程技术交底建设单位应该组织设计单位对工程施工方和监理方进行工程的技术交底,也即设计方针对每张设计图纸进行技术要点解读,并回答对方的质疑。设计单位应认真听取和考虑施工方的合理化建议,如果设计单位同意并采纳对方建议,应提供修改变更后的图纸,出示工程设计变更通
The technical requirements for the construction and acceptance of biogas projects can be implemented according to the provisions of “Biogas Engineering Technical Specification Part 3: Construction and Acceptance” (NY / T1220.3-2006). 1 Technical preparation before construction (1) Engineering and technical construction The construction unit shall organize the design institute to submit the technical explanation of the engineering construction and supervision works, that is to say, the design principle shall carry out the technical explanation of each design drawing and answer each other’s questions . Design units should carefully listen to and consider the construction side of the rationalization proposals, if the design unit to agree and adopt the other proposals, should provide modified drawings, to produce engineering design changes