天津大唐国际盘山发电有限责任公司(以下简称盘电)现有2台60万千瓦国产火电机组,相继投产于2001年12月、2002年6月。盘电扁平化设置的组织机构包括设备工程部、发电部、安全监察部、总经理工作部、人力资源部、财务审计部、政治工作部、计划供应部、燃料管
Tianjin Datang International Panshan Power Generation Co., Ltd. (hereinafter referred to as Pandian) currently has two 600,000-kilowatt domestic thermal power units that have been put into operation in December 2001 and June 2002 respectively. The organization of the flat-panel electrical equipment includes equipment engineering department, power generation department, safety supervision department, general manager work department, human resources department, financial audit department, political work department, planning supply department, fuel pipe