【摘 要】随着我国公路体制改革的不断深化,公路工程市场竞争日愈加剧,工程价格战进入了白热化阶段,建筑原材料价格上涨、最低价中标制度、现金保证金制度三个市场因素的严酷冲击,直接导致公路工程施工企业利润大幅下滑和资金运转困难,公路企业面临极大的竞争压力,生存环境不容乐观。因此,想要在激烈的市场竞争中站稳脚跟,就必须坚持科学的成本管理原则,遵循正确的成本管理程序,弄清成本管理的具体内容,抓住成本管理的关键环节并采取相应的措施,实施有效的项目成本管理。本文对工程项目成本管理、企业在建工程项目成本管理中存在的不足进行了分析,并对加强企业在建工程成本管理与控制进行了研究探讨。
【关键词】在建工程;成本管理;研究
Highway construction project cost management enterprise
Liu Zhong-zhan,Zheng Xiao-guang,Du Ya-na
(Highway administration Heze Shandong 274000)
【Abstract】With the deepening of the reform of the system of highway roads construction market competition, the price war, engineering, architecture, entered the white-hot stage of rising prices of raw materials, the lowest bid system, market system of cash deposits of three factors, causing severe impact of highway engineering construction enterprise profit fell sharply and capital operation difficulty, highway enterprises face great pressure of competition, the environment is not optimistic. Accordingly, want to be in the fierce competition in the market gain a firm foothold, it must adhere to the principle of cost management science, follow the correct cost management procedure, make clear the specific content of cost management, the key link of cost management and adopt corresponding measures, the implementation of effective project cost management. Based on engineering project cost management, enterprise project under construction cost management is analyzed, and the insufficient to strengthen enterprise management and control the cost of construction project are discussed.
【Key words】Building project;Cost management;Research
随着我国公路体制的改革的不断深化,市场对公路企业管理的要求也越来越高。有大部分业主把支付保证金作为招标入围的先决条件,挤占企业在建工程资金,致使企业经济效益日趋下滑,对企业的生存和发展形成了很大的挑战,这样就迫使企业必须不断改进在建工程成本管理,对在建工程所消耗的人力资源、物质资源和费用开支,都需要进行指导、监督、调节和限制,及时纠正将要发生和已经发生的偏差,把各项生产费用控制在计划成本的范围之内,降低项目成本,提高经济效益。
1. 抓好在建工程施工阶段的成本控制,努力降低工程成本
(1)在建过程中按照各自的责任目标搞好成本控制和分析。①提高劳动生产率、节约开支,加强人工费的管理。②精简处机关机构,压减科室冗员和机关附属单位的人员,使在岗人员达到一专多能。对项目管理人员人数,要根据投资数额大小、技术复杂程度、施工难度和施工能力来确定。采取竞争上岗、定岗、定职、定人、定岗位风险系数;③对施工生产作业人员进行培训,及时提高他们的生产能力和技术水平,使他们能够完成和超额完成劳动定额,最大限度地以最少的劳动消耗,获得最大的劳动效率;④要加强科技管理学习和引进先进的管理方法、技术设备、工艺,以提高人机工作效率;⑤根据施工作业计划,通过网络作业流程分析,充分利用现有的工作面,尽可能组织平行作业,扩大工作面,使后续工序提前投入工作,提高工时利用效果,尽可能减少窝工现象。⑥选好施工企业工人,要择优选择那些有专业特长的,有实践经验的技术过硬的包工队,公平竞争,建立能者上庸者下的机制。尽可能少雇包工队,把自己单位的职工放在施工线上,发挥职工的最大积极性,创造不菲的效益,减轻包袱。
(2)材料费用的控制和分析。①合理确定材料数量。在工程建设中,材料成本占整个工程成本的比重最大,一般可达60%至70%左右。因此材料费的控制至关重要,材料费节余将影响到整个工程的节余,而且材料费具有较大的节约潜力。往往在其他成本出现亏损时,要靠材料成本的节约来弥补。对钢材、水泥实行限额发料,按理论用量加合理损耗的办法与施工作业队结算。节约时给予奖励,超出时由施工作业队自行承担,从施工作业队结算金额中扣除。这样施工作业队将会更合理的使用材料,减少浪费损失。②合理确定材料价格。材料价格同样是降低材料成本的关键。要确定材料价格,必须组织工程、物资、财务等人员到材料供应地进行充分的调查,货比三家,争取找到供货或提供服务的源头,以最优惠的价格取得供货;但并不是材料价格越低越好,还要把好材料的质量关。合格优质的材料加上成熟的工艺和熟练的技能,才能确保工程质量,要把握好材料物理性质、化学性质和力学性质,所有的材料都必须经过质量检验,现场材料员要把好所进材料的质量关,不能盲目地追求低价低成本而不顾工程质量。
(3)现场管理费控制和分析。现场管理费是与工程施工直接相关的成本,贯穿整个施工过程,直至保修期满。①做好雨季、冬季施工的准备工作,预防因突然的自然环境变化而影响施工;②严格按照施工规范、技术标准、质量要求施工。各个专业应制定严格的操作规程,对于不按照操作规程作业,造成施工成本增加的,由执行负责人负责;③防止质量事故发生。质量事故会增加返工费、停工费、返修费、事故处理费等。这部分费用可以通过先进的施工管理而降低;④做好工程施工的预防、检测工作。如及时对工程的质量进行检测,做好隐蔽记录,建立质量安全检查小组,随时检查施工安全、进度情况,做好预防工作。
2. 加强工程质量控制,实行全面质量管理,减少返工损失,减少和防止不合格品、废品损失
工程质量成本可分为预防成本、检测成本、质量事故成本、过剩投入成本等几个方面。对工程项目质量监控不力而造成的质量低劣会带来惨重的代价,这种代价既有经济方面的,也有危及生命安全的。目前我国施工项目成本管理中尚未建立起对工程项目质量成本的风险监控体系,比如总承包单位在进行工程转包、分包中的压价行为,使得转包、分包单位的价格太低而由此带来的施工过程中偷工减料等现象时有发生,严重影响工程项目的质量。一个工程项目的施工过程就是工程质量形成的过程。要达到质量的要求,需要开展两个方面的工作:一是质量的检验和保障工作,二是质量失败的补救工作,这两项工作都要发生费用,有时因质量问题造成的成本损失是十分惊人的,要在保证质量的前提下,加强控制,实行全面质量管理,努力降低质量成本,每道工序严格按照质量规范要求施工,尽量避免和减少返工、报废等造成的损失。
3. 加强安全管理,杜绝安全事故,减少事故损失
加强安全管理要着眼于预防事故的发生,降低工程施工企业的经营生产成本。通过加强安全管理可以降低事故发生的概率,我们还要在平时做好应急救援准备工作,以应对突发事件的发生,保护人员生命安全,最大限度地降低事故造成的经济损失。
(1)减少事故的发生次数,可增加经济效益。施工项目每一事故的发生,都可能会有设备的损坏、工件的损失以及工作场所恢复费用等。事故发生次数减少,项目就减少了这部分事故处理费用,最后体现于项目经济效益增加。另一方面,每一事故的发生都不可避免地造成施工项目的停工损失,而施工发生次数的减少以及施工严重程度的降低,也相应减少了停工损失费用,表现为项目间接经济效益的增加。
(2)制定应急预案,一旦发生事故,将损失降至最低程度。通过安全设计、操作、维护、检查等措施,可以预防事故,降低风险,但不可能达到绝对安全。因此,需要安全投入,制定万一发生事故后应采取的紧急措施和应急方案。建立事故应急救援体系,在事故发生后迅速控制事故发展,保护现场人员和场外人员的安全,将事故对人员、财产和环境造成的损失降低到最低程度。
4. 改进施工工艺,合理组织施工
(1)在施工过程中,积极推广应用新技术、新工艺。改革落后的传统工艺和作法不仅能够提高工程质量,同时因减少人工、材料以及设备的投入等,有效地降低了工程成本。如泵送混凝土也是一种全新的施工工艺,与传统的使用塔吊吊运料斗相比,节约了大量人力,提高了浇注质量,加快了施工速度,使塔吊的使用率提高,缩短了工期,减少了机械设备与周转材料的租赁费用,从总体上有效降低了成本;同商品混凝土相比,泵送混凝土的价格优势是明显的。合理地采用适合项目特点的新技术、新工艺,加大施工中的科技含量是降低工程成本的有效途径。
(2)广泛采用先进技术、新工艺、新材料、新机具。可使施工时投入的材料(如架管、模板等)机具等大量减少、劳力减少、工期减短,会给项目带来可观的经济效益。因此,对每个项目施工之前,充分调动技术管理人员和经济管理人员,依靠科学技术创新,因地制宜,尽量采用先进技术、新工艺,新材料,如附墙爬升脚手架、滑模、早拆模技术,一次成活技术,落地砂浆再利用,筛余砂头、碎砖、废石利用等.同时将施工结果与相关施工者的经济利益挂钩,以提高工作效率,建立专项管理制度,定期检查,确保人员和技术的落实,取得实实在在的效果。
5. 完善合同文本,规范合同条款,避免经济损失
施工项目的各种经济活动,都是以合同或协议的形式出现,如果合同条款不严谨,就会造成自己蒙受损失时应有的索赔条款不能成立,产生不必要的损失。所以必须细致周密的订立严谨的合同条款。首先,应有相对固定的经济合同管理人员,并且精通经济合同法规有关知识,必要时应持证上岗;其次是应加强经济合同管理人员的工作责任心;三是应制定相应固定的合同标准格式。施工项目合同基本上有以下几类:委托加工合同、购货合同、分包合同、劳务合同、技术服务合同、租赁合同、其它协议等。各种合同条款在形成之前应由工程、技术、合同、财务、成本等业务部门参与定稿,使各项条款内涵清楚,严谨不漏。
6. 加强各部门沟通管理,做到在建工程成本管理运转有序
沟通管理是项目管理的一个重要方面,不注意沟通,各行其是,互相掣肘,会浪费时间、精力和资源;沟通得好,成本管理的各个环节运转有序,可以保证成本管理工作顺畅进行,减少不必要的损失浪费。项目沟通有许多种方法,项目会议是项目管理者进行有效的项目沟通的重要途径。一般可以采取“三会”制进行沟通。“三会”即:由经理部领导班子成员组成的“办公会”;由生产系统各部门负责人组成的“生产调度会”;由各业务部门负责人组成的“业务会”。其中:“业务会”负责进行计划成本编制、实施、经营核算和及时处理计划成本实施过程中出现的问题等业务工作;同时,结合实行计划成本管理中出现的新情况,完善和规范劳动工资、材料供应、机械设备等业务管理制度。“生产调度会”负责对现场的工期、安全和质量进行协调管理,并按经理部下达的计划成本的要求对施工现场进行工程项目管理和成本费用控制。“办公会”负责经理部各项管理措施的决策,处理业务会和生产调度会提交的需由经理部决策的问题。通过“三会”制,把经理部决策层、生产指挥系统和经营管理系统有机地结合在一起,使经理部成为一个充满活力、坚强的整体,各项业务管理工作紧跟现场生产节奏,秩序井然地进行。
7. 使用灵活的用工制度和聘用、考核、奖惩机制,提高工作积极性
企业可以参照国际惯例,采用灵活的用工制度并对人员实行了动态弹性管理,做到“勤者留,懒者走”。同时企业还可以建立相应的聘用机制、考核机制、激励和惩罚机制,员工在上岗前必须经过资格审查或相应的考试,以确保雇员的素质;考核机制是指雇员上岗后,由人事部门及部门负责人定期考核,考核结果作为对雇员进行奖励或惩罚的基础;赏罚分明的机制能提高员工工作积极性,确保工作效率方面取得良好的效果。
8. 建立健全在建工程的跟踪监控制度,完善在建工程成本约束机制
建立健全跟踪监控制度,及时纠正、修正在施工过程中发生的问题,避免铸成大错,造成损失,秋后算账,是当前亟待解决的问题。因此,应由公司纪检、审计、工程等部门组成监察大队,由书记带队,每一个月检查审核一次,主要是工程质量、工程进度以及工程拨款支付情况,在确认没有问题时,项目经理可继续任职,否则应立即撤换,以免造成更大的损失。通过对企业的跟踪监控,进一步保证了企业的盈利水平,使亏损企业扭亏为盈或减亏。
9. 结语
总之,要实行在建工程项目成本的有效管理,切实解决企业在建工程项目管理中存在的问题,就必须加强成本意识,健全企业在建过程管理,使在建工程项目成本管理成为工程项目管理绩效评价的客观、公正的标尺,以保证企业的利益,提高企业的管理水平和社会声誉,使企业在市场竞争中立于不败之地。
参考文献
[1] 田元福.建设工程项目管理[M].清华大学出版社,2005.
[2] 李雪梅.浅谈工程成本管理[J].水利水电施工,2006,2.
[3] 张承彬.工程项目成本管理的监管控制[J].现代会计,2006,4.
[4] 赵宪波.工程项目成本管理探讨[J].科技信息(学术研究),2007,36.
[文章编号]1006-7619(2010)07-22-165
[作者简介] 刘中站(1974.10),男,工程师,现在菏泽市公路管理局二处工作。
【关键词】在建工程;成本管理;研究
Highway construction project cost management enterprise
Liu Zhong-zhan,Zheng Xiao-guang,Du Ya-na
(Highway administration Heze Shandong 274000)
【Abstract】With the deepening of the reform of the system of highway roads construction market competition, the price war, engineering, architecture, entered the white-hot stage of rising prices of raw materials, the lowest bid system, market system of cash deposits of three factors, causing severe impact of highway engineering construction enterprise profit fell sharply and capital operation difficulty, highway enterprises face great pressure of competition, the environment is not optimistic. Accordingly, want to be in the fierce competition in the market gain a firm foothold, it must adhere to the principle of cost management science, follow the correct cost management procedure, make clear the specific content of cost management, the key link of cost management and adopt corresponding measures, the implementation of effective project cost management. Based on engineering project cost management, enterprise project under construction cost management is analyzed, and the insufficient to strengthen enterprise management and control the cost of construction project are discussed.
【Key words】Building project;Cost management;Research
随着我国公路体制的改革的不断深化,市场对公路企业管理的要求也越来越高。有大部分业主把支付保证金作为招标入围的先决条件,挤占企业在建工程资金,致使企业经济效益日趋下滑,对企业的生存和发展形成了很大的挑战,这样就迫使企业必须不断改进在建工程成本管理,对在建工程所消耗的人力资源、物质资源和费用开支,都需要进行指导、监督、调节和限制,及时纠正将要发生和已经发生的偏差,把各项生产费用控制在计划成本的范围之内,降低项目成本,提高经济效益。
1. 抓好在建工程施工阶段的成本控制,努力降低工程成本
(1)在建过程中按照各自的责任目标搞好成本控制和分析。①提高劳动生产率、节约开支,加强人工费的管理。②精简处机关机构,压减科室冗员和机关附属单位的人员,使在岗人员达到一专多能。对项目管理人员人数,要根据投资数额大小、技术复杂程度、施工难度和施工能力来确定。采取竞争上岗、定岗、定职、定人、定岗位风险系数;③对施工生产作业人员进行培训,及时提高他们的生产能力和技术水平,使他们能够完成和超额完成劳动定额,最大限度地以最少的劳动消耗,获得最大的劳动效率;④要加强科技管理学习和引进先进的管理方法、技术设备、工艺,以提高人机工作效率;⑤根据施工作业计划,通过网络作业流程分析,充分利用现有的工作面,尽可能组织平行作业,扩大工作面,使后续工序提前投入工作,提高工时利用效果,尽可能减少窝工现象。⑥选好施工企业工人,要择优选择那些有专业特长的,有实践经验的技术过硬的包工队,公平竞争,建立能者上庸者下的机制。尽可能少雇包工队,把自己单位的职工放在施工线上,发挥职工的最大积极性,创造不菲的效益,减轻包袱。
(2)材料费用的控制和分析。①合理确定材料数量。在工程建设中,材料成本占整个工程成本的比重最大,一般可达60%至70%左右。因此材料费的控制至关重要,材料费节余将影响到整个工程的节余,而且材料费具有较大的节约潜力。往往在其他成本出现亏损时,要靠材料成本的节约来弥补。对钢材、水泥实行限额发料,按理论用量加合理损耗的办法与施工作业队结算。节约时给予奖励,超出时由施工作业队自行承担,从施工作业队结算金额中扣除。这样施工作业队将会更合理的使用材料,减少浪费损失。②合理确定材料价格。材料价格同样是降低材料成本的关键。要确定材料价格,必须组织工程、物资、财务等人员到材料供应地进行充分的调查,货比三家,争取找到供货或提供服务的源头,以最优惠的价格取得供货;但并不是材料价格越低越好,还要把好材料的质量关。合格优质的材料加上成熟的工艺和熟练的技能,才能确保工程质量,要把握好材料物理性质、化学性质和力学性质,所有的材料都必须经过质量检验,现场材料员要把好所进材料的质量关,不能盲目地追求低价低成本而不顾工程质量。
(3)现场管理费控制和分析。现场管理费是与工程施工直接相关的成本,贯穿整个施工过程,直至保修期满。①做好雨季、冬季施工的准备工作,预防因突然的自然环境变化而影响施工;②严格按照施工规范、技术标准、质量要求施工。各个专业应制定严格的操作规程,对于不按照操作规程作业,造成施工成本增加的,由执行负责人负责;③防止质量事故发生。质量事故会增加返工费、停工费、返修费、事故处理费等。这部分费用可以通过先进的施工管理而降低;④做好工程施工的预防、检测工作。如及时对工程的质量进行检测,做好隐蔽记录,建立质量安全检查小组,随时检查施工安全、进度情况,做好预防工作。
2. 加强工程质量控制,实行全面质量管理,减少返工损失,减少和防止不合格品、废品损失
工程质量成本可分为预防成本、检测成本、质量事故成本、过剩投入成本等几个方面。对工程项目质量监控不力而造成的质量低劣会带来惨重的代价,这种代价既有经济方面的,也有危及生命安全的。目前我国施工项目成本管理中尚未建立起对工程项目质量成本的风险监控体系,比如总承包单位在进行工程转包、分包中的压价行为,使得转包、分包单位的价格太低而由此带来的施工过程中偷工减料等现象时有发生,严重影响工程项目的质量。一个工程项目的施工过程就是工程质量形成的过程。要达到质量的要求,需要开展两个方面的工作:一是质量的检验和保障工作,二是质量失败的补救工作,这两项工作都要发生费用,有时因质量问题造成的成本损失是十分惊人的,要在保证质量的前提下,加强控制,实行全面质量管理,努力降低质量成本,每道工序严格按照质量规范要求施工,尽量避免和减少返工、报废等造成的损失。
3. 加强安全管理,杜绝安全事故,减少事故损失
加强安全管理要着眼于预防事故的发生,降低工程施工企业的经营生产成本。通过加强安全管理可以降低事故发生的概率,我们还要在平时做好应急救援准备工作,以应对突发事件的发生,保护人员生命安全,最大限度地降低事故造成的经济损失。
(1)减少事故的发生次数,可增加经济效益。施工项目每一事故的发生,都可能会有设备的损坏、工件的损失以及工作场所恢复费用等。事故发生次数减少,项目就减少了这部分事故处理费用,最后体现于项目经济效益增加。另一方面,每一事故的发生都不可避免地造成施工项目的停工损失,而施工发生次数的减少以及施工严重程度的降低,也相应减少了停工损失费用,表现为项目间接经济效益的增加。
(2)制定应急预案,一旦发生事故,将损失降至最低程度。通过安全设计、操作、维护、检查等措施,可以预防事故,降低风险,但不可能达到绝对安全。因此,需要安全投入,制定万一发生事故后应采取的紧急措施和应急方案。建立事故应急救援体系,在事故发生后迅速控制事故发展,保护现场人员和场外人员的安全,将事故对人员、财产和环境造成的损失降低到最低程度。
4. 改进施工工艺,合理组织施工
(1)在施工过程中,积极推广应用新技术、新工艺。改革落后的传统工艺和作法不仅能够提高工程质量,同时因减少人工、材料以及设备的投入等,有效地降低了工程成本。如泵送混凝土也是一种全新的施工工艺,与传统的使用塔吊吊运料斗相比,节约了大量人力,提高了浇注质量,加快了施工速度,使塔吊的使用率提高,缩短了工期,减少了机械设备与周转材料的租赁费用,从总体上有效降低了成本;同商品混凝土相比,泵送混凝土的价格优势是明显的。合理地采用适合项目特点的新技术、新工艺,加大施工中的科技含量是降低工程成本的有效途径。
(2)广泛采用先进技术、新工艺、新材料、新机具。可使施工时投入的材料(如架管、模板等)机具等大量减少、劳力减少、工期减短,会给项目带来可观的经济效益。因此,对每个项目施工之前,充分调动技术管理人员和经济管理人员,依靠科学技术创新,因地制宜,尽量采用先进技术、新工艺,新材料,如附墙爬升脚手架、滑模、早拆模技术,一次成活技术,落地砂浆再利用,筛余砂头、碎砖、废石利用等.同时将施工结果与相关施工者的经济利益挂钩,以提高工作效率,建立专项管理制度,定期检查,确保人员和技术的落实,取得实实在在的效果。
5. 完善合同文本,规范合同条款,避免经济损失
施工项目的各种经济活动,都是以合同或协议的形式出现,如果合同条款不严谨,就会造成自己蒙受损失时应有的索赔条款不能成立,产生不必要的损失。所以必须细致周密的订立严谨的合同条款。首先,应有相对固定的经济合同管理人员,并且精通经济合同法规有关知识,必要时应持证上岗;其次是应加强经济合同管理人员的工作责任心;三是应制定相应固定的合同标准格式。施工项目合同基本上有以下几类:委托加工合同、购货合同、分包合同、劳务合同、技术服务合同、租赁合同、其它协议等。各种合同条款在形成之前应由工程、技术、合同、财务、成本等业务部门参与定稿,使各项条款内涵清楚,严谨不漏。
6. 加强各部门沟通管理,做到在建工程成本管理运转有序
沟通管理是项目管理的一个重要方面,不注意沟通,各行其是,互相掣肘,会浪费时间、精力和资源;沟通得好,成本管理的各个环节运转有序,可以保证成本管理工作顺畅进行,减少不必要的损失浪费。项目沟通有许多种方法,项目会议是项目管理者进行有效的项目沟通的重要途径。一般可以采取“三会”制进行沟通。“三会”即:由经理部领导班子成员组成的“办公会”;由生产系统各部门负责人组成的“生产调度会”;由各业务部门负责人组成的“业务会”。其中:“业务会”负责进行计划成本编制、实施、经营核算和及时处理计划成本实施过程中出现的问题等业务工作;同时,结合实行计划成本管理中出现的新情况,完善和规范劳动工资、材料供应、机械设备等业务管理制度。“生产调度会”负责对现场的工期、安全和质量进行协调管理,并按经理部下达的计划成本的要求对施工现场进行工程项目管理和成本费用控制。“办公会”负责经理部各项管理措施的决策,处理业务会和生产调度会提交的需由经理部决策的问题。通过“三会”制,把经理部决策层、生产指挥系统和经营管理系统有机地结合在一起,使经理部成为一个充满活力、坚强的整体,各项业务管理工作紧跟现场生产节奏,秩序井然地进行。
7. 使用灵活的用工制度和聘用、考核、奖惩机制,提高工作积极性
企业可以参照国际惯例,采用灵活的用工制度并对人员实行了动态弹性管理,做到“勤者留,懒者走”。同时企业还可以建立相应的聘用机制、考核机制、激励和惩罚机制,员工在上岗前必须经过资格审查或相应的考试,以确保雇员的素质;考核机制是指雇员上岗后,由人事部门及部门负责人定期考核,考核结果作为对雇员进行奖励或惩罚的基础;赏罚分明的机制能提高员工工作积极性,确保工作效率方面取得良好的效果。
8. 建立健全在建工程的跟踪监控制度,完善在建工程成本约束机制
建立健全跟踪监控制度,及时纠正、修正在施工过程中发生的问题,避免铸成大错,造成损失,秋后算账,是当前亟待解决的问题。因此,应由公司纪检、审计、工程等部门组成监察大队,由书记带队,每一个月检查审核一次,主要是工程质量、工程进度以及工程拨款支付情况,在确认没有问题时,项目经理可继续任职,否则应立即撤换,以免造成更大的损失。通过对企业的跟踪监控,进一步保证了企业的盈利水平,使亏损企业扭亏为盈或减亏。
9. 结语
总之,要实行在建工程项目成本的有效管理,切实解决企业在建工程项目管理中存在的问题,就必须加强成本意识,健全企业在建过程管理,使在建工程项目成本管理成为工程项目管理绩效评价的客观、公正的标尺,以保证企业的利益,提高企业的管理水平和社会声誉,使企业在市场竞争中立于不败之地。
参考文献
[1] 田元福.建设工程项目管理[M].清华大学出版社,2005.
[2] 李雪梅.浅谈工程成本管理[J].水利水电施工,2006,2.
[3] 张承彬.工程项目成本管理的监管控制[J].现代会计,2006,4.
[4] 赵宪波.工程项目成本管理探讨[J].科技信息(学术研究),2007,36.
[文章编号]1006-7619(2010)07-22-165
[作者简介] 刘中站(1974.10),男,工程师,现在菏泽市公路管理局二处工作。